My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
5608
>
2300 - Underground Storage Tank Program
>
PR0231786
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:32:18 PM
Creation date
11/6/2018 10:31:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231786
PE
2361
FACILITY_ID
FA0003727
FACILITY_NAME
CHEVRON STATION #96465 (INACT)
STREET_NUMBER
5608
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10815011
CURRENT_STATUS
02
SITE_LOCATION
5608 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PERSHING\5608\PR0231786\BILLING 1985-1993 .PDF
QuestysFileName
BILLING 1985-1993
QuestysRecordDate
8/23/2017 4:13:21 PM
QuestysRecordID
3602741
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ecooN e <br /> STATE OF CALIFORNIA ' ` <br /> STATE WATER RESOURCES CONTROL BOARD i <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ^mom o <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. �""°""��' <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT O 5 CHANGE OF INFORMATION ❑ PERMANENTLY CLOSED O <br /> ONE ITEM ❑ 2 INTERIM PERMIT F7 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> //c - <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.0.If B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) IfM/ D. TANK CAPACITY IN GALLONS: / <br /> ILTANK C TENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 7 MOTOR VEHICLE FUEL ❑ 4 OIL B. O. ❑ Te RE DPO n 3 DIESEL ❑ 6 AVIATIONGAS <br /> A ❑ 2 PETROLEUM O 80 EMPTY 1 PRODUCT PREMIUM IL=�1� 4 GASAHOL ❑ 7 METHANOL <br /> UN <br /> �DE <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEAOEDD ❑ 99 JET <br /> OTHERFUEL <br /> (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, EN R NAME OF SUBSTANCE STORED !) C.A.S.0: <br /> III. TANK CONSTRU ION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALL THAT APPLVS IN BOX <br /> A. TYPE OF IV 7 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LI R 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT ULTED TANK) ❑ 99 OTHER <br /> B. TANK F-] 1 BARE STEEL E::] 2 STAINLESS STEEL EV3 <br /> FIBERGLASS ❑ 4 STEEL CLAD Wl FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOW ❑ 99 OTHER <br /> LINING ,I,,,lwfi/' <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO a -/ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE AIFABOVEGR RGROUND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION p 2 PflESSUR A U 3 GRAVITY p U 98 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U DOUBLE WALL p 3 LINED TRE p U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A 6-3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING 3INTERSTITIAL ❑ 99 OTHER <br /> MONRORING <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DAT LAST USE (MOIDAV/VR) 2.ESTIMATEOOUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAININO GALLONS INERTMATERIAL7 YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PAINTED a SIGNATURE( <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMITNUMBEflI PERMIT APPROVED BV/DATE PERMIT EXPIRATION-DATE -�ZJ <br /> FORM B (9 90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION <br /> -FOR/MM A,UNLESS <br /> A CURRENT FORM A HAS BEEN FILED. <br /> 00 �� FOROAWB' <br />
The URL can be used to link to this page
Your browser does not support the video tag.