My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\7647\PR0231227\INSTALL 1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW 53VML 310FBALL FLOAT V T VALVES <br /> Federal EPA Technical Standards <br /> Federal EPA technical standards for overfill prevention of petroleum UST's allow <br /> the use of ball float vent valves that restrict the delivery flow when the UST is over- <br /> filled.The EPA requirements state that this flow restriction must occur when the <br /> tank is no more than 90% full.The OPW 53VML series is designed to consistently <br /> and dramatically reduce delivery flow rate. (See OPW 30MV to comply with EPA <br /> standards for a 30 minute warning.) <br /> Important <br /> Installing the incorrect length OPW 53VML for your specific UST application <br /> may result in delivery flow restriction at liquid levels exceeding the 90% maximum <br /> established by EPA. Always consult the appropriate tank charts and determine the <br /> specifics of your UST installation to determine the appropriate length OPW <br /> 53VML.The illustration and instructions below are intended to serve as a guide in <br /> this determination. <br /> Existing Installation Grade Level <br /> (Tanks bUried or backfilled) <br /> ♦ Measure distance"I" from a <br /> reference point near grade level to <br /> the top of the extractor cage bar. ;:; ® a-o °` � Q a��''o- a•Reference <br /> OPW 104A•� Point <br /> ♦Using theappropriate wrench, �4 oa <br /> $ 'b. C] t3: ° :a o..' ao0o 4 <br /> remove the extractor cage and Manhole ors o ' o. o <br /> v g°c5R+p9 Q.4'Yi' Q;G�Q-.V <br /> OPW 1 ]pill• a o °o. °• • v� o <br /> existine float vent valve. <br /> Container '° `� °�' ° ° ° �'�' Q• °pO n °'4 i <br /> ♦Measure distance"II"'from the same ' ' d��01 <br /> ��, �°pi <br /> a •,•O• ( ! <br /> ON ` ''o. o <br /> reference point near grade level to P �o•'• g©o no:� °4 <br /> the inside diameter or the UST. Or, °0-0 ' c' . �?a�;° Seo 0- ° <br /> �.� ;OPW 1611 AV po °'; .!op d Qo <br /> using a dipstick,determine the o d �Oq- ° 4 °' O ° •O .� <br /> ° return tilting <br /> distance from the reference point to :�P�fc::o r•sr s �:'- .-o�; ©.a o, phi�oCJ:q. .,pOo o' <br /> the bottom of the UST, and subtract OPW 233V or 233VM Vapor Y =`?• ° ..b.':oo�.' <br /> the tank inside diameter. recovery/extractor fitting z;°_a -O .•Qo•�_Cs,• o= a•Qtr�; <br /> o From the correct tank chart, ; ; ;d .'=4.=: _°aQ_e <br /> determine the distance"IV"that S 4"Tank"Bun <br /> ?i Fain <br /> corresponds to 10% of the total UST g • <br /> capacity. t7• o. Op. o °�.�o. a A; 00 <br /> •OPW 53VML length(V )—U+IV- °'_:r ` - -a: �o•,o: <br /> I- : 11ST?,.n• °�10%of total <br /> A lank capacity j <br /> New Installation %"vapor 1V as determined <br /> orifice from appro- <br /> (Tanks not buried) priate tank <br /> ♦ Follow the same procedure above or char <br /> measure and calculate dimension"V" <br /> from the inside diameter of the UST <br /> to the end of a 2" npt.pipe threaded <br /> into the extractor cage.The nominal l <br /> tight engagement of 2" pipe threads <br /> is X". IMPORTANT:OPW products should be used in com- <br /> ♦OPW 53VML length(VI)=IV+V pliance with applicable federal,state and local laws <br /> and regulations.Product selection should be based on <br /> physical specifications and limitations and compatibil- I <br /> Technical Votes ity with the environment and material to be handled. <br /> OPW MAKES NO WARRANTY OF FITNESS FOR <br /> ♦For extended manway applications. A PARTICULAR USE.All-illustrations and specifica- <br /> the total length of coupling and pipe tions in this literature are based on the latest product <br /> extension far the OPW 53VML information available at the time of publication.Dover/ <br /> OPW reserves the right to make changes at any time in <br /> should match the length of the prices,materials.specifications and models and to dis- <br /> manway extender. continue models without notice or obligation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.