My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\7647\PR0231227\INSTALL 1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC EAL P4��N•. <br /> �H SER. 1�.ES �a.. .� <br /> SAN JOAQUIN COUNTY ' o� <br /> ENVIRONMENTAL HEALTH DIVISION W . <br /> ` <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer .. <br /> 445 N. San Joaquin Street • P.O. Box 388 • Stockton, CA 95201-0388 <br /> (209) 468-3420 <br /> TO: INSTALLE AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-EHD) has established the <br /> following guidelines to assist you in the completion of your construction project. The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> a. Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental. <br /> Health Division. Upon approval, one set will be retained by the department and the other <br /> two will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures describing <br /> operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> C. Include detailed monitoring and response plans for facility. <br /> d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. FLAN REVIEW AND OPERATING PERMIT FEES <br /> a. New facility plan review fee of 5624.00 (8 hour minimum per facility), $170.00 fee per tank, <br /> plus $56,00 state surcharge fee per tank is due at time of plan submittal. 4 3 ,A ,�{n �47S, Y �(. <br /> b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br /> minimum per facility) plus$170.00 fee per new tank,and$56.00 per tank state surcharge fee. <br /> C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of 578.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days. A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> E To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. <br /> A Di kion of titin Joa{luin Uminty Health Car•c Ser kvi <br />
The URL can be used to link to this page
Your browser does not support the video tag.