My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:38:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\P\PACIFIC\7647\PR0231227\INSTALL 1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> US7#SYSTEM pRINTSET I FORMATION <br /> 1. 11 cmplete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location and number of tanks. <br /> 4. vl Tank cross-sectional diagram included on prints submitted. <br /> S. Detail of tank, piping system, excavation and cover. <br /> 6. _� Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) & 26351 <br /> 7. ✓ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. ✓ Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. -' Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br /> [Section 2635 (b) (6) & (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # ! # # # # <br /> f '7 r.� <br /> CAPACITY1 ' boo 27-1 WO 1G- 660 S <br /> MANUFACTURER ic-ff)(Cs <br /> COMPOSITION r at7Mlk5 <br /> MODEL / y <br /> PRODUCT 4 01 ,1 c, e 7 <br /> CORROSION PRCTECTION (, 6 <br /> U.L. LISTED <br /> CCMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> y (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.), <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician_ <br /> (3) Docunent stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.