My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICARDY
>
1501
>
2300 - Underground Storage Tank Program
>
PR0541151
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:10 AM
Creation date
11/6/2018 10:40:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0541151
PE
2361
FACILITY_ID
FA0009789
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #6
STREET_NUMBER
1501
STREET_NAME
PICARDY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
13515001
CURRENT_STATUS
02
SITE_LOCATION
1501 picardy DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PICARDY\PR0541151\BILLING .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ♦F'S�ui r.9 Cp <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ ERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: lA <br /> 67 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.A B. MANUFACTURED BV: <br /> C. DATE INSTALL D(MO/DAVIVEAR) Z/ D. TANK CAPACITY IN GALLONS: <br /> ILTANKC TENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> REGULAR1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑ 1aUNLEAD D 3 DIESEL ❑ 6 AVIATION GAS <br /> A 4 GASAHOL ❑ <br /> BO EMPTY 1 PRODUCT 1b PREMIUM 7 METHANOL <br /> ❑ 2 PETROLEUM ❑ ❑ UNLEADED ❑ 5 JETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.c <br /> III. TANK CONSTRUCTION MARKONEITEMONLVINBOXESA,B.ANDC.ANDALLTHATAPPLIESINBOXDANDE <br /> ❑ 1 DOUBLE WALL [73 SINGLE WALL WITH EXTERIOR LINER E] 95 UNKNOWN <br /> A. TYPE OF <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> MATERIAL ❑ s CONCRETE <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? VES_ NO— <br /> D.CORROSION <br /> ❑ 1 POLYETHYLENE WRAP [:] 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 95 UNKNOWN 99 OTHER 91 NONE ❑ ❑ <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U a 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 0 MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATICTANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATE J,pS MOIOAV/VR) 2.ESTIMATED QUANTITY OF - 3.WAS TANK FILLED WITH YES NO <br /> SUBSTANCE QUANTITY <br /> REMAGALLONS INERT MATERIAL? ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> DATE <br /> APPLICANTS NAME <br /> (PRINTED d SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE 1.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY li JURISDICTION# FACILITY# TASK 71 <br /> V <br /> 1STATE LD.# rl-i'7/ `�q -ILIA /L11PERMIT APPROVED BV/DATE PERMIT EXPIRATION DATEFORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FI <br /> FORO <br />
The URL can be used to link to this page
Your browser does not support the video tag.