Laserfiche WebLink
REVISIONS <br /> "' ND ST "' RAGE TANK <br /> '" R "' RO <br /> ILJNDE U U <br /> REM- OVAL AND COMPLIANCE UPGRADES <br /> UQ <br /> CERTIFIED GROCERS O :W?+a. <br /> F o <br /> i <br /> FACILITY 0Zu �t - <br /> _ � � x <br /> STOCK y � <br /> ZZ zM tz <br /> - <br /> :) 0 <br /> iii1 <br /> nt b - <br /> tn = <br /> z <br /> U <br /> GENERAL REQUIREMENTS <br /> These General Requirements apply to all sections of the specifications as if stated separately <br /> in each section. PROJECT: ABREVIATIONS <br /> I <br /> WORK INCLUDED: All labor, material, utilities and equipment required for performance (A/C) Asphalt (asphaltic concrete) <br /> and completion of work shown on accompanying drawings, including procurement of and SITE ADDRESS: 1990 PICCOLI ROAD (A/G) Above Ground v <br /> payment for necessary permits unless otherwise noted on the plans or specifications or (BGS) Below Ground Surface <br /> specified by Owner Representative. STOCKTON, CA (Cont.) Concrete = <br /> (Dia.) Diameter A-1 TITLE SHEET to cc <br /> DOCUMENTS: Drawings and specifications are cooperative. Work not detailed or (E) Ezis[iitg t---f -_ <br /> specified must be same quality and type as work detailed or specified. Contractor shall FACILITY: TRUCKING FACILITY Fin. Finish Qt N — <br /> verifv all dimensions and conditions on the site. Report at once any discrepmcies found ( > A-_ REMOVAL & UPGRADE PLAN <br /> between drawings and site conditions for adjustment before starting work in question. (FRP) Fiberglass Reinforced Plastic ^ CA <br /> Contractor to keep a complete set of drawings and specifications and permits on the job at PROJECT DESCRIPTION: (H.P.) Horsepower A_3 DETAILS <br /> all tunas. (Liq.) Liquid a U <br /> (Min.) Minimum r <br /> LAWS, CODES, ORDINANCES AND REGULATIONS: Laws, Codes; Ordinances and I. REMOVAL OF (1) 20,000 GALLON � <br /> Regulations which ❑ I to this work shall be followed. Contractor to handle arl variations (i`/laX.) IVIQSimUtmm E-I ELECTRICAL <br /> apply y DIESEL UNDERGROUND TANK. (N) New Z <br /> 6envzen plans and governing ordinances before smrting work. z <br /> (PSI) Pounds Per Square Inch <br /> SPEC I SPECIFICATIONS <br /> PRECAUTIONS: Contractor shall take care to minimize damage to adjoining property. 2. INSTALLATION OF NEW PIPING ANBD (PVC) Poly-vinyl Cloride U <br /> earthwork trees and give notice of proposed work to adjoining property owners. Protect (R/R) Remove / Replace }moi E S <br /> completed work from damage until accepted by Owner Representative. 1998 COMPLIANCE UPGRADES. (SCH.) Schedule �1 <br /> MATERIAL: All material to be new and of brand herein specified ore equal. Brands and (TYP)) Typical U <br /> p q (UST) Underground Storage Tank <br /> erodes specified are approved and included to establish type and quality requirements. <br /> Contractor shall provide owner with "submittal package" of equipment used in construction. (V) Volts <br /> ` (VR) Veeder - Root — C/) <br /> SUPERVISION ANDCOORDINATION: Contractor is responsible for progress, execution <br /> and quality of work and is to coordinare and expedite procurement of materials and <br /> performance of the project. Contractor to have a qualified responsible representative on the <br /> jobsite at rill critical times, including time of final inspection. Contractor is responsible for <br /> establishing and maintaining all line, levels and grades shown on plans. <br /> - <br /> RESPONSIBILITY: The Contractor accepts responsibility for proper handling and SCOPE OF PROJECT ABREVIATIONS SHEET INDEX <br /> installation of the fiberglass reinforced plastic (FRP) or composite underground woks and - <br /> FRP piping, and shall ensure that good workmanship, practices and construction procedures <br /> are followed during the handling and installation of the tanks and piping. <br /> Contractor is responsible for inspection of the ranks for damage upon receipt at the job site. <br /> TESTING AND INSPECTION: If the Owner Representative determines, during the course W N of construction, that additional inspections or testing, whether by Owner Representative or a U O - <br /> resting agency, O P4 are necessary, the Contractor shall cooperate in making arrangements for n/ <br /> such tests. The nature and type of tests and/or inspections to be conducted in addition to Q r. <br /> those specifically called for on the plans or in the specifications, will be paid by the Owner. r, 'i U <br /> FAULTY / SUBGRADE MATERIAL: All material which is determined to be FREEWAY trrF�i L/ <br /> unsatisfactory shall be removed from the job site and replaced with acceptable material. H O <br /> SAFETY: Contractor shall perform the work in accordance with safe practices, cao <br /> king all �R\,O <br /> reasonable precautions to protect the owner's facility, workmen and the public and vN O w H z <br /> providing, where reasonable necessary, fencing and barriers. White on the premises of >L4INTENANCE BLDG. H _ <br /> Owner or its affiliates all of Owner's safety rules shall be observed: in particular, smoking <br /> shall be limited to such locations and occasions as are specifically authorized in writing by <br /> Owner only. Contractor shall not perform or permit any act on the premises of Owner or its ce Q r <br /> JBUD%VEISFR X <br /> affiliates which invokes a fire or explosion hazard, including wending, toren cutting and 0 ------- (� n <br /> disposal of debris by burning, without prior written consent of Owner. - ENVIRONMENT..' ... `4 DIVISION U r~ (/) <br /> ___ _-� 304 E.Weber Avg <br /> All contractors. subcontractors, employees, etc. performing on-sire must be property trained P. O Bax'+ftR G .,:,u5g01-03RR <br /> and certified in Hazardous Waste Operations and Entergenev Response (HAZWOPER) in \YORK C n� <br /> accordance vvnh 29 CFR 1910.120. AREA <br /> DISTRIBUTION �+� 6��� lvt S ae yU e <br /> WARNING: Tests indicate that prolonged or repeated exposure to petroleum substances. in } ttxis't'z r.,3 1"-1-71, - a --- -- tan . cf t9yl , _ <br /> < r r �.tl�tx fn t y1£s Ffiro"'',i FACILITY Date q..17' <l by v <br /> liquid or vapor form, may be harmful Refer to Material Safety Data Sheets for specific r� ,t r 5'1`-, n� / r <br /> information on various petroleum products. 1 <br /> p p s i .F I o � }tfC - .per PROJECT NO. tOSI <br /> 1990 PICCOLI ROAD �10 5c i'S-F�t'R S <br /> Follow manufacturers precautions for fiberglass piping, resins. or solvents used in — 90 PICCOLI <br /> ROAD <br /> , -- 1e" L x 'ff9Z ur�tLrt2L92 1 <br /> assemblin ,.the piping syuenm. a�;aga t+r R �\ <br /> ti3i.7�a]a�t i s' +v; SCALE: <br /> PLEASE NOTE: All underground utilities noted on the plans ARE approxmtat: in location, nv£ fx fir{ �t PICCOLI ROAD <br /> depth, size. etc. Contractor shall not held responsible to utility damage underground. All <br /> utilities may not be shown or noted. Underground Service Alert (USA) shall be notified a <br /> minimum of 48 hours prior to the start of any excavation work. AUGUST 10, 1997 <br /> A - 1 <br /> VICINITY MAP SITE LOCATION MAP APPROVALS <br />