My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
0
>
2300 - Underground Storage Tank Program
>
PR0503303
>
REMOVAL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:27 AM
Creation date
11/6/2018 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1988
RECORD_ID
PR0503303
PE
2381
FACILITY_ID
FA0005775
FACILITY_NAME
SOUTHERN PACIFIC TRANSPORTATIO
STREET_NUMBER
0
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\0\PR0503303\REMOVAL 1988 .PDF
QuestysFileName
REMOVAL 1988
QuestysRecordDate
8/22/2017 11:23:59 PM
QuestysRecordID
3602269
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 QUALITY ASSURANCE AND QUALITY CONTROL <br /> Quality Assurance (QA) is defined as the integrated program designed for <br /> assuring reliability of monitoring and measurement data. Quality Control <br /> ' (00) is defined as the routine application of procedures for obtaining <br /> prescribed standards of performance in the monitoring and measurement <br /> process. The overall QA objectives are to develop and implement <br /> standardized procedures for obtaining and evaluating data that can be used <br /> 1 to assess site hazards and develop and evaluate alternative remedial <br /> actions. <br /> The QA/QC plan presented herein is designed to implement the procedures <br /> necessary to maintain a consistent quality of technical products and will <br /> ' be employed by Canonie in fulfilling the requirements of this workplan. <br /> This consistency is accomplished through the standardization and <br /> ' documentation of field techniques and activities. All field activities <br /> will be planned in advance and reviewed by the technical project personnel . <br /> Laboratory activities will be performed by properly trained and qualified <br /> personnel and will conform to the specific procedures outlined in the <br /> ' subsequent sections. <br /> Project deliverables resulting from these activities will be submitted and <br /> reviewed for completeness, reliability, accuracy, and conformance with <br /> specified procedures. Each deliverable will be reviewed by a project <br /> manager and a senior technical professional (vice president level ) prior to <br /> issuance to SPTCo. and the regulatory agencies. Senior reviewers will <br /> ' evaluate project deliverables on the basis of professional standards of <br /> practice, Canonie standards of quality, and established regulatory <br /> performance criteria. Because project deliverables could be used in <br /> ' litigation, it is extremely important that all work meets these standards <br /> of quality. Subsequent to the internal review performed by Canonie, <br /> ldeliverables will be submitted to SPTCo. SPTCo. will review the documents <br /> and all comments generated will be addressed and incorporated into the <br /> document for submittal to the regulatory agency. <br /> Canonie E nv i r on mer std l <br />
The URL can be used to link to this page
Your browser does not support the video tag.