Laserfiche WebLink
U <br /> L Il, <br /> sux <br /> CoQ <br /> MATERIAL AND WORKMANSHIP 16. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD II WITH PIPING REMOVAL 0 J LL <br /> TO, THE STANDARDS OF THE FOLLOWING: FITTINGS AND 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY -3 �q ! , ' <br /> I. UNLE55 OTHERWISE SPECIFICALLY PROVICED IN THESE DOCUMENTS, ALL 3000L WITH ALCOHOL FITTINGS AND RP45 ADHESIVE. DO NOT MIX SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DIVISION (PAZ.) F D -1 - 3 <br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK UNIFORM FIRE CODE (UFC) MANUFACTURER'S MATERIALS. GUIDELINES AND SOIL AND GROUNDWATER SAMPLING REQUIREMENTS X <br /> COVERED BY THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) SHALL BE FOLLOWED AT ALL TIMES, EXCEPT WHERE THE FOLLOWING ,ray Z o (y) S Qt <br /> GRADE FOR THE PROCESS INTENDED. AMERICAN PETROLEUM INSTITUTE (API) C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN SPECIFICATIONS ARE MORE RESTRICTIVE, Or7 = in Q B � <br /> AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) TRAINED BY MANUFACTURER. Vl IL IL Q 0 � 0 <br /> o <br /> 2. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S AGENT FOR HIS UNIFORM BUILDING CODE (UBC) OWNER SHALL FILL ALL USTa TO 70 OF CAPACITY, PRIOR TO START. <br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND NATIONAL ELECTRIC CODE (NEC) D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE Q- <br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE NATIONAL FIRE PROTECTION AGENCY (NFPA) 40, OR EXTRA STRONG. GALVANIZED PIPE 15 NOT ALLOWED. FITTINGS PIPING TO BE REMOVED SHALL BE EMPTIED OF ALL CONTENTS PRIOR TO <br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND UNDERWRITER'S LABORATORIES, INC. (UL) SHALL BE 300 PSI MALLEABLE IRON. REMOVAL. PIPING SHALL BE STOCKPILED ON-51TE PRIOR TO DISPOSAL. FTS O <br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES CALIFORNIA REGULATIONS DUE NOT INDUCE AIR OR WATER INTO THE EXISTING TANKS. F+ I �/ cv <br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. LOCAL ORDINANCES E: ALL STEEL PIPE BELOW GRADE 15 TO BE DOUBLE WRAPPED WITH 20 IL{ <br /> MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL V15UALI-Y INSPECT PIPE TRENCH FOR INDICATION OF LEAKAGE. A SOIL <br /> 3, WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE 11. SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP. SAMPLE SHALL BE TAKEN AND ANALYZED AT THE ENDS AND AT LE45T <br /> OWNER'S AGENT, THE CONTRACTOR SPALL FURNISH THE AGENT FOR DURATION OF THE CONTRACT A SITE HEALTH d SAFETY PLAN THAT WILL EACH TWENTY LINEAL FEET OF TRENCH, AND WHERE INSPECTION OF <br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, F: ALL THREADED CONNECTIONS SHALL BE TPREADED WITH SEALANT TRENCH OR PIPING REVEAL EVIDENCE OF LEAKAGE. <br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK. WHEN 50 AND: WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL <br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE COMPATIBILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH IF INSPECTION REVEALS EVIDENCE OF LEAKAGE, IT 5HALL BE <br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH DOCUMENTED IN WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. <br /> AND AUTHORIZED TO 5UPERV15E AND ENFORCE COMPLIANCE WITH THE SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br /> 4, MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED HEALTH AND SAFETY PLAN, SUBMIT THE NAME AND QUALIFICATIONS OF 501L SAMPLES SHALL BE COLLECTED FROM THE NATIVE SOIL AT OR <} <br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK G: G.G. SPALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL JUST BELOW THE INTERFACE OF THE BACKFILL WITH THE NATIVE SOIL. Z a) NQ <br /> REJECTION. ON THE SITE. MATERIALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. SAMPLES SHALL BE TAKEN U51NG A DRIVEN-TUBE TYPE SAMPLER, W (p0 x <br /> CAPPED AND SEALED WITH INERT MATERIALS. FORMAL, SIGNED CHAIN- u' > Q N <br /> S. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND B: THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE 11, DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS, PIPING RUNE, OVER OF-CUSTODY RECORDS SHALL BE MAINTAINED FOR EACH SAMPLE AND _ <br /> REGULATIONS. NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES TANKS SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY SUBMITTED WITH THE RESULTS TO THE REGULATING AGENCY. W WL V w V <br /> NEAREST THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE MNFR. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING J r x -:3 (so a) y Q <br /> 6. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS 15 NOT 5POWN ON SITE PLAN, G.C. SHALL RUN LINES THE MOST DIRECT A. THE ENDS OF THE BRASS TUBE SHALL BE COVERED WITH ALUMINUM o o ~ n1 U <br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OR HAZARDOUS SU55TANCEB BE UNCOVERED. ROUTE SUBJECT TO APPROVAL BY OUJNER'5 REPRESENTATIVE. FOIL, THEN PLASTIC END CAP5, AND FINALLY WRAPPED WITH A SUITABLE W .T. [0 W �,OF THE OWNER'S AGENT/ENGINEER. TAPE. Y V I j y - ,j Q) W <br /> C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP 12. PIPING SYSTEMS SHALL BE TESTED PER CURRENT MANUFACTURER'S <br /> 1. IF ANY OF 7HE5E DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE I1,16TRUCTION5 SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE �a LL m S m 1- <br /> B. THE SAMPLE SHALL BE IMMEDIATELY PLACED ON ICE, OR DRY ICE, <br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF TH15 CONDITION, IF THE CORRECTIVE ACTION 15 INSUFFICIENT IN THE PRECEDENCE OVER OTHER INSTRUCTIONS. FOR TRANSPORT TO A LABORATORY. FORMAL CHAIN-OF-CUSTODY Q - <br /> PROJECT, IT IS EXPECTED THAT THE M05T RESTRICTIVE CONDI7ION(5) OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL RECORDS SHALL BE MAINTAINED AND SUBMITTED FOR EACH SAMPLE. ) <br /> WOULD APPLY. CORRECTIVE ACTION CAN BE IMPLEMENTED. A: G.G. TO NOTIFY OWNER'5 REPRE5ENTATIvE TWO WORKING DAYS PRIOR m R Q <br /> TO LINE TESTING, OWNER'S REP. SHALL WITNESS ALL LINE TESTING AT HIS/HER C. IF THE BOTTOM OF THE TRENCH IS BELOW THE GROUNDWATER TABLE, Q <br /> D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHER'S WITH A MINIMUM DISCRETION. MARK TEST PRESSURES ON GAUGE WITH ELECTRICAL TAPE AT 501E SAMPLES ARE NOT REQUIRED. IN THIS CASE, A WATER SAMPLE <br /> GENERAL CONDITIONS CLA55 RATING OF 2-4,20-B:C WITHIN 50 FEET OF THE OPERATION. BEGINNING OF TESTS. PRESSURE SHALL HOLD FOR AT LEAST ONE (U SHALL BE COLLECTED A5 SOON AS F05515LE FROM THE SURFACE OF N <br /> HOUR AND BE WITNESSED BY OWNER'S REPRESENTATIVE. DO NOT BACKFILL THE GROUNDWATER IN THE EXCAVATION. A CHECK SHALL INITIALLY BE z <br /> I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING 15. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY TRENCHES UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. MADE FOR ANY FREE FLOATING PRODUCT. IF NO FLOATING PRODUCT 15 ILIu <br /> COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE MEMBERS OF USA. 2 FULL WORKING DAYS IN ADVANCE OF PERFORMING DETECTED, THEN A WATER SAMPLE SHALL BE TAKEN WITH A DEVICE <br /> PROVIDED TO THE OWNER'$ ENGINEER PRIOR TO THE START OF WORK. ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM B: TEST PRESSURES SHALL BE: DESIGNED TO REDUCE THE L055 OF VOLATILE COMPONENTS. A BAILER J <br /> NUMBER (800) 221-2600. 2" - 50 P51 AND APPLY SOAP SOLUTION. 15 A SUITABLE SAMPLING DEVICE. THE WATER SAMPLE SHALL BE <br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S 3" - 40 PSI AND APPLY SOAP SOLUTION. IMMEDIATELY POURED INTO A VOLATILE ORGANIC ANALYSIS (VOA) VIAL <br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA UST 3" - SECONDARY - 5 PSI AND APPLY SOAP SOLUTION. WITH AS LITTLE AGITATION AS POSSIBLE. A TEFLON SEPTUM SHALL BE <br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER. PETROLEUM WORK SCOPE USED TO SEAL THIS VIAL, <br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST C. CAUTION: DISCONNECT FLEX CONNECTOR FROM STP AND CAP PRIOR <br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO 1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND TO TESTING. APPLY d RELEASE PRESSURE SLOWLY. VENT/VAPOR SYSTEM SOIL AND WATER SAMPLES SHALL BE ANALYZED FOR TOTAL 0 <br /> OWNER. SCHEDULE THAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF SHALL BE TESTED FROM TOP OF VENT, THROUGH MANIFOLD(S), EXTRACTOR HYDROCARBONS AND OTHER CONTAMINANTS AS DICTATED BY Q <br /> THE PROJECT TO THE FULLEST EXTENT POSSIBLE. BASE AND RISER, STAGE I CONTAINMENT MANHOLES, STAGE II VAPOR CURRENT CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD ILI Ill Q <br /> 3: CONTRACTOR 70 HAVE BEEN TRAINED AND CERTIFIED BY THE TANK LINES TO ISLANDS AND STAGE 11 FLEX CONNECTORS AT DISPENSER($). REGULATIONS AND PRACTICES, AND LOCAL REGULATIONS. Q z V J <br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH 2, FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP .-1 di � W 13 <br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY D. SLOWLY PRESSURIZE PRODUCT LINES AND VENT/VAPOR SYSTEM TO 50 LL <br /> OWNER. CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST SECURE FENCING PANELS TOGETHER. P51. SOAP ENTIRE PIPE SURFACES INCLUDING JOINTS AND FITTINGS, OWNER SUPPLIED EQUIPMENT <br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CIFECKLI5T TO CORRECT ANY LEAKS AND RETEST. <br /> OWNER. 3. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANK TRIM d PIPING. CONTRACTORS ARE ADVISED TO CONFIRM OWNER SUPPLIED n W +- <br /> E. SLOWLY RELIEVE PRE55URE FROM VAPOR/VENT SYSTEM AND REMOVE EQUIPMENT WITH OWNER. 4 m W O <br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN. FOR TANK SAMPLING PRIOR TO pFF-HAUL, PLUG FROM EACH EXTRACTOR AFTER TEST. REDUCE PRODUCT LINE <br /> 4. WHEN SOIL IS TO 8E STOCKPILED ON SITE FOR SA <br /> Q U Q o LL <br /> INSTALLATION PRIOR TO THE START OF WORK. CONTRACTOR SHALL PLACE EXCAVATED SOIL A AND SHALL COVER WITH 4 PRESSURE TO 5 PSI. MONITOR DAILY UNTIL ALL YARD PAVNG 15 <br /> CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH IT'S MIL. PLASTIC UNTIL SOIL 15 REMOVED, IN AREA TO BE APPROVED COMPLETE. <br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED TO OWNER BY OWNER / G.C. <br /> F. SECONDARY PIPE MUST BE PROPERLY CUT. INSPECT ALL PRIMARY <br /> 5. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: S. G.G. SHALL PROVIDE FOR DISTRIBUTION OF ALL EXCAVATED SOIL, PER PIPE SURFACES. PRESSURIZE SECONDARY PIPE P 5 PSI AND SOAP ALL <br /> GENERAL PROJECT REQUIREMENTS. PIPE SURFACE AND FITTINGS. PRESSURE ON THE PIPING SECONDARY <br /> A. GENERAL ENGINEERING SPACE SHALL BE MAINTAINED UNTIL AFTER THE PAYING IS IN PLACE OVER <br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING TANK FIELD AND PIPING RUNS, AND SHALL BE WITNESSED BY THE OWNER'S <br /> 6. NOT USED. REPRESENTATIVE. U Y lu z <br /> 6. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL- 1Z / ' llJ 8 m <br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER . INSTALL TANK TRIM E EQUIPMENT PER DRAWINGS AND CURRENT MNFR'$. G. AFTER BEING WITNESSED BY OWNER'S REPRESENTATIVE, REMOVE V w 0 <br /> INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE H dl 0 V <br /> AS "ADDITIONAL INSURED". PRESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER <br /> PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS PAVING IS IN PLACE J O U! � Z 0 <br /> SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED. <br /> A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY Z Q Q� <br /> TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'$. REQ'$, OWNER'S REP. 13. G.C. SHALL PERFORM PRECISION TEST ON PRODUCT LINES AFTER PAYING � Z 0 � U � 7 <br /> B. COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE SHALL WITNESS ALL TANK TESTING AT HISMER DISCRETION. 15 COMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE, PRECISION O - Q Q) <br /> LIMIT OF NOT LESS THAN 0,000,000 PER OCCURRENCE FOR BODILY LINE TEST SHALL BE IN ACCORDANCE WITP NFPA 329, LOCAL W <br /> 8. CONTRACTOR TO INSTALL NEW ELECTRICAL SYSTEMS PER PLANSTS, OR La � Q O Z <br /> INJURY AND PROPERTY DAMAGE. AND M4NUFAC7URER'5 REQUIREMENTS. ARRANGE FOR ALL INSPECTIONS. CERTIFIED TESTER. G.C.AAPPROVED <br /> EQUPROAL, <br /> ESTWRI &PA L BE CONPORT CTE S Y A W V J Z Q <br /> C. AUTOMOBILE LIABILITY COvERiNG USE CFA" OWNED HIRED PROVIDE CONDUI TS/WIRING, J-BOXES, ETC. REQUIRED FOR ELECTRICAL TEST TO OWNER'S REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF W N <br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY SYSTEMS. PROJECT, <br /> OF NOT LESS THAN e1,000,000 PER OCCURRENCE FOR BODILY INJURY AND S. INSTALL EQUIPMENT AS LISTED IN EQUIPMENT LIST AND PROVIDE AND <br /> PROPERTY DAMAGE. INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE 14. CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC BACKPRESSURE <br /> PETROLEUM SYSTEM. TEST OF ALL VAPOR RETURN LINES AS REQUIRED BY LOCAL REGULATIONS. <br /> 1, CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND <br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE 10. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY 15. CONTRACTOR SHALL DO ANY OTHER TESTING AS REQUIRED BY LOCAL <br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR CONTAINMENT LINES PER.DRAWINGS. CURRENT MANUFACTURER'S REGULATIONS. <br /> REQUIRED BY THE DRAWINGS, EXCEPT AS NOTED BY OTHERS, INSTRUCTIONS SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE 16. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. <br /> PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS <br /> 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 15 COMPLETED. <br /> BUILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL CODE, 11. DISPENSER SUMPS, TURBINE SUMPS, AND OVERFILL BOXES ARE TO BE <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM COMPLETELY SEALED AND TESTED, PER CURRENT LOCAL REQUIREMENTS, <br /> CONSTRUCTION SAFETY ORDERS, AND ANY OTHER APPLICABLE STATE, CITY, RED THREAD IIA AND RED THREAD II WITH FITTINGS AND AND EVIDENCED BY OWNER'S REPRESENTATIVE. MINIMALLY: <br /> OR COUNTY ORDINANCES, 1000 AND 8000 SERIES ADHESIVE, OR AMERON DUALOY <br /> 3000L WITH ALCOHOL FITTINGS AND RP48 4DHESIVE. DO NOT MIX I. FILL WITH WATER TO HIGHEST PENETRATION. <br /> 5. ALL PETROLEUM PERMITS TO BE SECURED BY OWNER AND SUPPLIED TO MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT SYSTEMS 2. SPRAY PAINT TOP OF WATER -- <br /> CONTRACTOR, WHO 15 RESPONSIBLE FOR COMPLYING WITH ALL PERMIT SHALL BE UL APPROVED FOR 1009' METHANOL. CONTAINMENT SYSTEM SHALL <br /> CONDITIONS. CONTRACTOR SHALL SECURE MISC. ELECTRICAL PERMIT. BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES 18. PROVIDE AND INSTALL CONDUIT d WIRING FOR PETROLEUM SY57EM(S) AND IFI <br /> AND/OR FITTINGS, LIGHTING AS INDICATED. PROVIDE CONDUIT W/ PULL STRING WHERE FUTURE <br /> 10. CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF ELECTRICAL REQUIREMENTS ARE INDICATED ON THE DRAWINGS Il <br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HI5 BID. <br /> 19. ALL CONDUIT IS TO BE 3/4" (MINIMUM) RIGID CONDUIT. <br /> 11. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO <br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR 20, INSTALL NEW TLS 350 MONITORING SYSTEM, A5 REQUIRED, PER DRAWINGS <br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY AND OWNER'S EQUIPMENT LIST. u -'>>- (i <br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S -i 1i iu,- <br /> OPERATIONS. 21. INSTALL DISPENSERS, AND MISC. PETROLEUM SYSTEMS, AS INDICATED ON m iso „ <br /> PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST. (n _tLLu°Wu <br /> D. ,vo <br /> 12. ALL EXCAVATIONS 5HALL BE PERFORMED IN COMPLIANCE WITH OSHA AND W `vol3m <br /> STATE REGULATIONS. THE CONTRACTOR 15 REFERRED TO THE 05HA 22. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS Ill -y'g w o <br /> BOOKLET, "EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE --1 Y W °"�mF iF1, - <br /> LLF [ <br /> PRACTICES GUIDE FOR PERFORMING EXCAVATION WORK. STRENGTH AT 28 DAYS OF 3500 PSI. CONC. DE5;GN STRENGTH OVER 2500 P51 �- 0 CL F"ui <br /> 15 BY OWNER PREFERENCE, AND DOES NOT REQUIRE SPECIAL INSPECTIONS. 1 Z ® wo Ww�}w F <br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH 9ARC III ® <br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS BUIL75" 23. FULLY TEST ALL SYSTEMS, AND REPAIR AS NECESSARY. �9e E4p� 11I . V `tairz i <br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON �d+� " / I �ac, �. Jfiliiipl, <br /> APPROVED JOB COPY. <br /> 14. CONTRACTOR SHALL PROVIDE A LIST OF 5UB-CONTRACTOR5, IF ANY, WHO N n c aea� ni u� Q <br /> WILL BE USED ON THE PROJECT. �,/ yatos0�_ �_' L <br /> O/CA1}t iu _ � <br /> 15. CONTRACTOR SHALL COORDINATE ALL N5PECTION5 AND APPROVALS AND qc,- <br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES <br /> REQUIRED TO RUN THE FACILITY. <br /> i <br /> PET = 4 <br /> OF 5 SHEETS <br />