My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:17 AM
Creation date
11/6/2018 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
9/7/2017 9:00:20 PM
QuestysRecordID
3628601
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program ares <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468120 7- <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit befomakix <br /> the change.Required by CCR 2632(d)and 2641 (h). C <br /> Z <br /> '-4 <br /> FACILITY NAME DATE <br /> FACILITYADDRESS \\Zla �.—�( SQ . L nrn <br /> J <br /> 1.Name(s)and Title(s) of the people responsible for performing the monitoring and/or maintenance . <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location ofsensors <br /> 350 <br /> l�\ 3. tJ v\C > �5 S4. escrib4e <br /> 4.Describe the ollowing egutpment for each under and storage tank. <br /> Name and Model of Monitoring Panel V-R- -FL-�S 3- VLO,-<- <br /> Name and Model of Line Leak Detectors Vftagi L-,n 7-00 r, <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors —� <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes t9 No D <br /> Does the turbine shut down if a sensor is disconnected? Yes' , No D <br /> Does the turbine shut down is the monitoring panel loses power? Yest No D <br /> 6.How will the alarm history and subsequent maintenance be recorded?7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and Tecording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? �� 0-�� <br /> w-, <br /> .��cs�r�vv� w <br /> Note:Fornew installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testingperformed before January 1,2003. <br /> 8.Describe thttrairngnecess for the cope ation of IST system,including piping,and the monitoring <br /> equipment. L\ <br /> [:\Unit BAUSTWonitoringplan.do <br /> 5/30/2002 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.