Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program ares <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468120 7- <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit befomakix <br /> the change.Required by CCR 2632(d)and 2641 (h). C <br /> Z <br /> '-4 <br /> FACILITY NAME DATE <br /> FACILITYADDRESS \\Zla �.—�( SQ . L nrn <br /> J <br /> 1.Name(s)and Title(s) of the people responsible for performing the monitoring and/or maintenance . <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location ofsensors <br /> 350 <br /> l�\ 3. tJ v\C > �5 S4. escrib4e <br /> 4.Describe the ollowing egutpment for each under and storage tank. <br /> Name and Model of Monitoring Panel V-R- -FL-�S 3- VLO,-<- <br /> Name and Model of Line Leak Detectors Vftagi L-,n 7-00 r, <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors —� <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes t9 No D <br /> Does the turbine shut down if a sensor is disconnected? Yes' , No D <br /> Does the turbine shut down is the monitoring panel loses power? Yest No D <br /> 6.How will the alarm history and subsequent maintenance be recorded?7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and Tecording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? �� 0-�� <br /> w-, <br /> .��cs�r�vv� w <br /> Note:Fornew installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testingperformed before January 1,2003. <br /> 8.Describe thttrairngnecess for the cope ation of IST system,including piping,and the monitoring <br /> equipment. L\ <br /> [:\Unit BAUSTWonitoringplan.do <br /> 5/30/2002 - <br />