My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\INSTALL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � ' <br />4 RE UIItED INSPECTIONS <br />d at <br />Note: The contractor's BHS-EHD o phe PHplans HD inseUST ector uponllation request� In additionl be , the the <br />job site and must be shown P <br />applicable fire department shall approve the UST installation prior to commencement of <br />work. <br />All appointments for inspections must be made at least 48 hours in advance. Below are the <br />minimum required inspections: <br />a. Before installation, the tank shall be tested for tightness at the installation site in accordance <br />with the manufacturer's written guidelines, If there are no guidelines, the primary and <br />secondary containment shall be tested for tightness with air pressure between 3 and 5 pounds <br />per square inch. In lieu of a pressure test, a vacuum expressed in inches of mercury in the <br />interstitial space of the secondary containment, is acceptable. The pressure (or vacuum in <br />the interstitial space) shall be maintained for a minimum of 30 minutes. <br />secondary containment systems shall be tested for tightness after <br />b All new primary piping and <br />installation in accordance with manufacturer's guidelines. Primary pressurized piping shall <br />be hydrostatically tested at 150 percent of design operating pressure or pneumatically at 110 <br />percent of design operating pressure. If the calculated test pressure for pressurized piping is <br />less than 40 psi, 40 psi shall be used as the test pressure. The pressure shall be maintained <br />for a minimum of 30 minutes and all joints shall be soap tested. If there are no <br />manufacturer's guidelines, secondary containment systems shall be tested using an applicable <br />method specified in an industry code or engineering standard. <br />C. All lines other than pressure piping shall be pressure tested at not less than 3 p. s. i. and not <br />more than 5 p.s.i. for a minimum of 30 minutes and soap tested while under pressure. <br />d. Containment sumps shall pass a 24 hour hydrostatic leak test. <br />e. The spill container shall be shown to be capable of draining liquid back into the fuel tanks. <br />f. The monitoring system shall pass a functional test. The functional test shall consist of the <br />activation of the alarm via all monitoring probes/sensors. <br />g. Final inspection and approval to operate will be granted after the above requirements are <br />satisfied and a hard copy of the tank integrity test [as required by Section 2.635 (a) (5)] is <br />submitted to the inspector at the site. <br />If you need further assistance, or wish to schedule an appointment to discuss the plan review <br />or field inspection, please contact our Underground Storage Tank Staff at (209) 468-3427. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.