My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\INSTALL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . <br />" <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />_,4 <br />Plans drawn to scale in non -erasable print. <br />CAPACITY <br />3. <br />Z_Q C_ -%L> <br />Plot plan to show location of tanks and all associated piping. <br />MANUFACTURER <br />� t 3 <br />� I <br />4. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />COMPOSITION <br />5. <br />fit le- t_ <br />Tank cross-sectional diagram. <br />6. <br />MODEL <br />Detail of tank, associated piping, excavation and cover. <br />i )w� 7_.C1Cf- <br />7. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />�I `�W <br />t�gR0 h <br />FuC <br />Article 3, Section 2631 (b) & 26351 <br />8. <br />v <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />U.L. LISTED <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />COMPATIBILITY WITH 100% <br />METHANOL <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(1°) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)) <br />11. <br />ti <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 2.5291 (h)] <br />12. <br />TANK <br />COMPOSITION <br />TANK # <br /># <br /># <br /># <br /># <br /># <br />CAPACITY <br />Z_Q C_ -%L> <br />MANUFACTURER <br />� t 3 <br />� I <br />COMPOSITION <br />+ <br />fit le- t_ <br />MODEL <br />240 <br />i )w� 7_.C1Cf- <br />PRODUCT <br />�I `�W <br />t�gR0 h <br />FuC <br />CORROSION PROTECTION <br />" <br />U.L. LISTED <br />{4 <br />COMPATIBILITY WITH 100% <br />METHANOL <br />�� C <br />1 <br />13. TANK(s) TO BE INSTALLED <br />,N4- <br />A. <br />SSLA. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.