19 , <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />Piping (cross-sectional diagram, including connections to tank and dispensers). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />';O�) Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br />(B) I�S_ Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at.less than atmospheric pressure) (Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) f( Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements <br />Primary piping in contact with hazardous substance under normal operation conditions shall be: <br />installed inside a secondary containment system in the form of:_ -X, secondary pipe Vault or <br />Lined trench to be sloped to a collection sump at the low point of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />X Material compatible with the substance stored. <br />�` Covered and capable of supporting any expected vehicular traffic, <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: Model. <br />X Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />A—) Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />State Water Resources Control Board "facility (A)" and "Tank Permit (B)" application forms submitted. <br />x Plan review and operating permit fees paid. <br />What is the approximate depth to ground water: 6.-S <br />(include source of information - borehole togs, monitoring well data, water <br />studies, etc.) <br />Total number of tanks on site after installation: <br />County/City Fire District and Building Department notified. <br />In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements) as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner r operator must acknowledge this responsibility for workplan submittal by signatura date (below. <br />Name Title `105� Date �1 <br />�W►+F-CadOra.v Ca"t-IAr iY <br />CONDITIONS OF APPROVAL: !) AfS--,,-- Gis--I4 1,44 <br />