My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:24 AM
Creation date
11/6/2018 10:56:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\INSTALL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Introduction.................................................................2 <br />PART ONE: PRIMARY PRODUCTS PIPING -RED THREAD 11A <br />PIPE AND FITTINGS <br />SECTION 1 - Storage and Handling ............................4 <br />1.1.1 Packaging, Ordering, and <br />PART TWO: SECONDARY CONTAINMENT PIPING -RED <br />THREAD 11A PIPE AND RED THREAD 11A SECONDARY CON- <br />TAINMENT FITTINGS <br />SECTION 1 - Secondary Containment Piping <br />System Components..................................................21 <br />2.1.1 Secondary Containment Pipe ............................21 <br />2.1.2 Secondary Containment Fittings .......................21 <br />2.1.3 Adhesive for Secondary Containment Piping .... 21 <br />SECTION 2 - System Preparation..............................22 <br />2.2.1 Piping Layout.....................................................22 <br />2.2.2 Pipe Preparation and Tool Set-up and Use ......... 22 <br />2.2.3 Pipe Assembly.....................................................23 <br />2.2.4 Fitting Assembly.................................................24 <br />RED THREAD IIA Pipe dr Fittings <br />TABLE OF CONTENTS <br />SECTION 3 - Containment Crossover Detail ............ 24 <br />Shipping Information (Table 1.1.1) .....................4 <br />1.1.2 <br />Packaging..............................................................4 <br />1.1.3 <br />Storing..................................................................4 <br />2.4.2 Termination at the Dispenser ............................25 <br />1.1.4 <br />Transporting.........................................................4 <br />1.1.5 <br />Loading and Unloading.......................................4 <br />Size Reductions..........................................................26 <br />SECTION 2 - Layout and Preparation .........................5 <br />1.2.1 <br />Inspection.............................................................5 <br />....8 <br />1.2.2 <br />Installation Crew Size and Organization .............5 <br />SECTION 3 - Tool and Equipment List.......................5 <br />1.3.1 <br />Recommended Equipment for Cool Weather <br />SECTION 8 - Testing Recommendations for <br />Pipe Assembly.......................................................5 <br />1.3.2 <br />Recommended Equipment for Installing <br />SECTION 9 - Repairs..................................................30 <br />2"-4" Pipe..............................................................6 <br />SECTION 4 -joining Methods....................................6 <br />1.4.1 <br />General Concepts.................................................6 <br />29.3 Repairing Extensive Pipe Damage ......................31 <br />1.4.2 <br />Bell and Spigot Joining Method ...........................7 <br />SECTION 5 - Cutting and Tapering ............................7 <br />1.5.1 <br />Cutting..................................................................7 <br />1.5.2 <br />Tapering................................................................8 <br />SECTION 6 - Installation.............................................8 <br />1.6.1 <br />Piping Layout.......................................................8 <br />1.6.2 <br />Trenching and Backfilling....................................8 <br />1.6.3 <br />Adhesive Bonding................................................9 <br />1.6,4 <br />Joint Assembly....................................................11 <br />1.6.5 <br />Adhesive Cure Time...........................................13 <br />1.6,6 <br />Connecting to Other Systems ............................16 <br />1.6.7 <br />Flexible Hose Connections.................................16 <br />1.6.8 <br />Inspecting for Potential Causes <br />of Joint Failure....................................................17 <br />SECTION <br />7 - Testing Recommendations ..................17 <br />1.7.1 <br />Safety Precautions..............................................17 <br />1.7.2 <br />Test Procedures...................................................18 <br />1.7.3 <br />Air Test Procedures. and Safety Precaution. ........ <br />18 <br />SECTION <br />8 - Repair Procedures................................19 <br />1.8.1 <br />Repairing Weather Damage................................19 <br />1.8.2 <br />Pipe Patching......................................................19 <br />1.8.3 <br />Repairing Extensive Damage..............................20 <br />1.8.4 <br />Leaking Joints.....................................................21 <br />PART TWO: SECONDARY CONTAINMENT PIPING -RED <br />THREAD 11A PIPE AND RED THREAD 11A SECONDARY CON- <br />TAINMENT FITTINGS <br />SECTION 1 - Secondary Containment Piping <br />System Components..................................................21 <br />2.1.1 Secondary Containment Pipe ............................21 <br />2.1.2 Secondary Containment Fittings .......................21 <br />2.1.3 Adhesive for Secondary Containment Piping .... 21 <br />SECTION 2 - System Preparation..............................22 <br />2.2.1 Piping Layout.....................................................22 <br />2.2.2 Pipe Preparation and Tool Set-up and Use ......... 22 <br />2.2.3 Pipe Assembly.....................................................23 <br />2.2.4 Fitting Assembly.................................................24 <br />RED THREAD IIA Pipe dr Fittings <br />TABLE OF CONTENTS <br />SECTION 3 - Containment Crossover Detail ............ 24 <br />2.3.1 Preparation.........................................................24 <br />Table 1.2.1 <br />SECTION 4 - Termination Connections ...................25 <br />2.4.1 Termination at the Storage Tank .......................25 <br />Installation..................................................5 <br />2.4.2 Termination at the Dispenser ............................25 <br />Table 1.3.1 <br />2.4.3 Termination Fittings...........................................26 <br />SECTION 5 - Secondary Containment System <br />Electric Heating Collars...............................6 <br />Size Reductions..........................................................26 <br />SECTION 6 - Secondary Containment Saddles ........26 <br />SECTION 7 - Adhesive Bonding and Curing ............ 27 <br />2.7.1 Introduction.......................................................27 <br />....8 <br />2.7.2 Cleaning the Bonding Surfaces ..........................27 <br />2.7.3 Bonding..............................................................28 <br />2.7.4 Assembling and Bolting.....................................28 <br />2.7.5 Precautions.........................................................28 <br />2.7.6 Adhesive Cure.....................................................28 <br />SECTION 8 - Testing Recommendations for <br />Electric Heating Collars .............................14 <br />Secondary Containment Piping................................29 <br />Table 1.8.1 <br />SECTION 9 - Repairs..................................................30 <br />2.9.1 Replacing Leaning Secondary <br />Containment Joints............................................30 <br />2.9.2 Repairing Minor Pipe Damage ...........................31 <br />29.3 Repairing Extensive Pipe Damage ......................31 <br />PART THREE: TELESCOPING PIPE SYSTEM <br />SECTION 1 - RED THREAD IIA Secondary <br />Containment Telescoping Pipe System ....................31 <br />3.1.1 Telescoping System............................................31 <br />3.1.2 Assembly.............................................................31 <br />3.1.3 Description.........................................................31 <br />3.1.4 Installation.........................................................31 <br />LIST OF TABLES <br />Table 1.1.1 <br />Standard Packaging of Pipe .........................4 <br />Table 1.2.1 <br />Suggested Units of Labor for <br />Installation..................................................5 <br />Table 1.3.1 <br />Wattage Requirements for <br />Electric Heating Collars...............................6 <br />Table 1.3.2 <br />Extension Cord Length...............................6 <br />Table 1.6.1 <br />Recommended Minimum Burial Depths <br />....8 <br />Table 1.6.2 <br />Adhesive Kit Data......................................10 <br />Table 1.6.3 <br />Adhesive Cure Times When Using <br />Electric Heating Collars .............................14 <br />Table 1.8.1 <br />Make-up Dimensions (Wet) ......................20 <br />Table 2.2.1 Determining Length of <br />Containment Pipe.....................................23 <br />Table 2.3.1 Containment Crossover Information .......24 <br />Table 2.3.2 Pipe Separation Distances ..........................24 <br />Table 2.4.1 Termination Fitting Connections .............26 <br />Table 2.7.1 Number of Containment Fitting <br />Bonds per Adhesive Kit .............................28 <br />Table 3.1.1 Sizing for Telescoping Pipe Systems .......... 32 <br />Table 3.1.2 Determining Length of <br />Containment Pipe.....................................32 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.