Laserfiche WebLink
i • <br /> STATE OF CALIFORNIA � Po <br /> STATE WATER RESOURCES CONTROL BOARD s`PPfz _ �o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B Ye <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. �""�^"'� <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM �2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED ./ <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ( O <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.a ® B. MANUFACTURED BY: v <br /> C. DATE INSTALLED(MO/DAY/YEAR) 0. TANK CAPACITY IN GALLONS: GT�U <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. la REGULAR <br /> 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ TROLEUM ❑ 80 EMPTY 1 PRODUCT E::] ib PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> ❑ <br /> ❑ 3 CHEMICAL PRODUCT F795 UNKNOWN [E:::] UNLEADED 5 JETFUEL <br /> 2 WASTE ❑ 2 LEADED ❑ Og OTHER (DESCRIBE IN ITEM D. BELOW) <br /> 0. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM I� 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7-ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR <br /> F-11 RUBBER LINED A❑—, 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING ❑ 5GLASS LINING Lyl 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE'WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN O 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE llf-VP1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH p U 95 UNKNOWN q U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A� UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINETIGHTNESSTESTING ❑ 3 MONOORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> 11:1 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 6 GROUND WATER MONITORING <br /> N.6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> (PRINTED 8 SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE LD.# m <br /> PERMIT NUMBER PERMIT APPROVED BV/DATE PERMIT E%PIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORMA HAS BEEN FILE,Q <br /> FORM B (12-91) .- <br /> FILE THIS FORM WITH FOCAL AGENCY IMPLEMENTING THE UNDERGROUND ST9gAGE TANK REGULATIONS`�dh,E+ <br /> FORKNIB R6 <br /> Lf- � <br />