My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
POPLAR
>
230
>
2300 - Underground Storage Tank Program
>
PR0234380
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:33:19 AM
Creation date
11/6/2018 11:19:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0234380
PE
2332
FACILITY_ID
FA0003576
FACILITY_NAME
BOCHICCHIO, HELEN
STREET_NUMBER
230
Direction
N
STREET_NAME
POPLAR
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21722104
CURRENT_STATUS
02
SITE_LOCATION
230 N POPLAR AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\POPLAR\230\PR0234380\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
3/12/2018 7:41:07 PM
QuestysRecordID
3826065
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIASTATE WATER RESOURCES CONTROL BOARD <br /> oo es <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> 2 INTERIM PERMIT <br /> MARK ONLY � 1 NEW PERMIT <br /> ONE ITEM ❑ ❑ 3 RENEWAL PERMIT ED5 CHANGE OF INFORMATION c" <br /> 4 AMENDED PERMIT 7 PERMANENTLY CLOSED ON SITE <br /> O 6 TEMPORARY TANK CLOSURE Oq <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 6 TANK REMOVED � <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- 4 ✓ <br /> SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# / <br /> C. DATE INSTALLED(MO/DAY/YEAR) B. MANUFACTURED BY: <br /> �n mi✓H <br /> OL,/✓+ D. TANK <br /> II.TANK CONTENTS CAPACITY IN GALLONS: <br /> FA-I IS MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL g C ❑ 1a REGULAR 3 DIESEL <br /> ❑ 2 PETROLEUM O 00 EMPTY UNLEADED `n� ❑ 6 AVIATION GAS <br /> ❑ 1 PRODUCT ❑ ib PREMIUM �.l 4 GASAHOL <br /> ❑ 3 CHEMICAL PRODUCT �-gB UNKNOWN UNLEADED ❑ 5 JET FUEL ❑ 7 METHANOL <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED ❑ 2 WASTE ❑ 2 LEADED <br /> ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.S.ANDC,ANOALLTHAT APPLIES IN BOXDAND <br /> A. TYPE OF ❑ 1 DOUBLE WALL E <br /> ❑ 3 SINGLE WALL WITH EXTERIOR LINER <br /> SYSTEM ❑ 2 SINGLE WALL -- ❑ 4 95 UNKNOWN <br /> SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL <br /> E] 3 FIBERGLASS E] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL El 5 CONCRETE <br /> ❑ B POLYVINYL CHLORIDE ❑ 7 ALUMINUM <br /> (PrimaryTank) ❑ g BRONZE E] 8 100% METHANOL COMPATIBLE W/FRP <br /> ❑ 10 GALVANIZED STEEL UNKNOWN <br /> ❑ 99 OTHER <br /> 1:31 RUBBER LINED ❑ 2 ALKYD LINING <br /> C.INTERIOR ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING ❑ 6 UNLINED <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? UNKNOWN ❑ g9 OTHER <br /> VES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING <br /> PROTECTION ❑ 3 VINYL E] 4 FIBERGLASS REINFORCED PLASTIC <br /> ❑ 5 CATHODIC PROTECTION ❑ 91 NONE <br /> L�q �UNKNOWNWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) <br /> OVERFILL IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE TION EQUIPMENT INSTALLED YEAR) <br /> A. SYSTEM IYFF A U 1 SUCTION <br /> A U 2 PRESSURE p U 3 GRAVITY <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 3 LINED TRENCH A UNKNOWN A U <br /> A 99 OTHER <br /> U 2 STAINLESS STEEL A U 3 <br /> CORROSION A U 5 ALUMINUM A U B CONCRETE POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> PROTECTION A U 9 GALVANIZED STEEL A U 7 STEE /COATING A U 8 100% METHANOL COMPATISLEW/FRP <br /> D. LEAK DETECTION 1 AUTOMATICLINE LEAK DETECTOR CATHODIC PROTECTION <`5',90 UNKNOWN <br /> A U 99 OTHER <br /> ❑ 2 LINE TIGHTNESS TESTING —�� <br /> V.TANK LEAK DETECTION MONITORING M 99 OTHER <br /> —_— <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 8 TANK TESTING ❑ 7 INTERSTITIAL MONITORING <br /> 1 NONE ❑ 95 UNKNOWN <br /> VI.TANK CLOSURE INFORMATION 0990 <br /> THER <br /> 1.ESTIMATED DATE LAST USED(MO/DAV/YR) 2.ESTIMATEDOUAN717yOP <br /> SUBSTANCE REMAINING GALLONS 3 WASNERTMILLERREDIILITH YES NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> (PRINTED b SIGNATURE) <br /> DATE <br /> LOCAL AGENCY USE ONLY THE S=I.D.# <br /> UMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> Y# JURISDICTION# FACILITY# TANK#[;;STATE <br /> R C7 <br /> ERMIT APPROVED BY/DATE <br /> PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. f Z <br /> • • FOg0a31&RS� <br />
The URL can be used to link to this page
Your browser does not support the video tag.