My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
550
>
2300 - Underground Storage Tank Program
>
PR0504723
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 10:34:10 AM
Creation date
11/6/2018 12:03:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0504723
PE
2381
FACILITY_ID
FA0006291
FACILITY_NAME
EDDIE E WISNER
STREET_NUMBER
550
Direction
N
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
550 N SACRAMENTO ST
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SACRAMENTO\550\PR0504723\REMOVAL 1989 .PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
10/17/2017 3:59:56 PM
QuestysRecordID
3684078
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 i <br /> S��T .JC�A.QLTTN LD�� HE�T.TH DI .�TR2CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native solls beneath the tank 's <br /> invert [tank 's bottom] at a collection depth not be exceed 2 -- 9 feet. If contamination <br /> is documented during closure an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM^ NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or 'pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> ,001 gallons and up THREE OR MORE Ends and Middle or <br /> per tankgeneral] spaced along <br /> the leng h of the tank <br /> Ping ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS from wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWOgroundwater ONE <br /> interface <br /> GREATHAN From wall next to ONE <br /> 10,000 GALLONS tank ends at soil/ <br /> OR groundwater <br /> TANK CLUSTER FOUR interface <br /> aq?HE;R S PE+C I.AL. Gar4n I T I CaN S <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. (Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ] <br /> TANK SIZE MINIMUM NUM13DR OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons THREE per tank Center and ends or sides <br /> 1000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tankggenerallyy spaced along <br /> _the length of the tank <br /> EH 23 097 1.2/88 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.