Laserfiche WebLink
• STATE OF CALIFORNIASTATE WATER RESOURCES CONTROL BOARD <br /> • <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B oi` <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. ' <br /> EIDBA <br /> K ONLY ❑ 1 NEW PERMIT `'��.o.n� <br /> E ITEM ❑ ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION <br /> 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 7 PERMANENTLY CLOSED ONSITE <br /> OR FACILITY NAME WHERE TANK IS INSTALLED: a�ZO ❑ s TEMPORARY TANK CLOSURE <br /> ❑ 8 TANK REMOVED <br /> I. TANK DESCRIPTIONO <br /> COMPLETE ALL ITEMS- <br /> SPECIFY IF UNKNOWN <br /> A OWNER'S TANK 1.D.# C_�II <br /> C. DATE INSTALLED(MO/DAY/YEAR) v � <br /> , B. MANUFACTURED BY: <br /> . lr. � . <br /> II.TANK CONTENTS IFA-11S MARKED,COMPLETE ITEM C. D. TANK CAPACITY IN GALLONS: �i QVC <br /> A 1 MOTOR VEHICLE FUEL <br /> 0401- B. <br /> ❑ 2 PETROLEUM ❑ C. 1e REGULAR UNLEADED ❑ 3 DIESEL ED AVIATION GAS 80 EMPTY 1❑ PRODUCT 1b PREMIUM UNLEADED 3 CHEMICAL PRODUCT ❑ 85 7 METHANOL <br /> UNKNOWN ❑ 2 WASTE ❑ 4 GASAHOL ❑ <br /> ❑ LEAUNLEADED <br /> DADE <br /> 2 ❑ ❑ <br /> D. IF(A-1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED ❑ 2 LEADED B M85 <br /> 5 JETFUEL <br /> ❑ 99 OTHER(DESCRIBE IN REM D.BELOV✓) <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C.AND ALL THAT APPLIES IN BOX D AND E C A.S.#: <br /> A. TYPE OF ❑ i DOUBLE WALL ❑ 3 SINGLE WALL WITH <br /> SYSTEMED EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM <br /> �, ❑ 95 UNKNOWN <br /> 2 SINGLE WALL �q SINGLE WALL IN A VAULT <br /> B. TANK n\ BARE STEELED99 OTHER <br /> ❑ 2 STAINLESS STEEL <br /> MATERIAL ❑ 5 CONCRETE ❑ 3 FIBERGLASS ❑ q STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> (Primary Tank) ❑ 6 POLYVINYL CHLORIDE 7 ALUMINUM <br /> ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ a5 UNKNOWN ❑ 8 1METHANOL COMPATIBLE W/P-p <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ ❑ 99OOTHER <br /> ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING <br /> LINING OR E] 5 GLASS LINING ❑ 4 PHENOLIC LINING <br /> ❑ 8 UNLINED <br /> COATING 95 UNKNOWN ❑ <br /> IS LINING MATERIAL COMPATIBLE WITH 100,5 METHANOL? 99 OTHER <br /> D.EXTERIOR YES— NO— <br /> D❑ 1 POLYETHYLENE WRAP ❑ 2 COATING <br /> ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE � <br /> SPILL CONTAINMENiINSTALLED ) UNKNOWN ❑ gg OTHER <br /> E.SPILL AND OVERFILL,etc. ogoP TUBE Yes (YEAR <br /> No OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAq) <br /> W.PIPING INFORMATION STRFUNDE GR YES NOP DISPENSE-CONTAINMENT YES_ <br /> CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE NO <br /> A. SYSTEM TYPE a®1 SUCTION A U 2 PRESSURE <br /> A U 3 GRAVITY A U 4 FLEXIBLE PIPING p <br /> SINGLE WALL A U 2 DOUBLE WgLL U 99 OTHER <br /> B. CONSTRUCTION �1 <br /> A U 3 LINED TRENCH A U 95 UNKNOWN <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL p U 99 OTHER <br /> CORROSION A U 5 ALUMINUM A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> A U 6 CONCRETE A U 7 STEELW/COATING <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 8 100% METHANOL COMPATIBLE W/FRP <br /> D. LEAK DETECTION ❑i UEI �uNE IFA,It ❑2 u k TIGxTN35 A�5 UNKNOWN A U 99 OTHER <br /> _ <br /> TESTING ❑3 CGNfIN0005 INfEgSmiAl ❑4�=,,IC UK ❑5 AUTOMATIC PUIM <br /> MONTORING LEAK GETECTGR <br /> V.TANK LEAK DETECTION sxuToovm ❑ 9s OTHER <br /> ❑ I VISUAL CHECK <br /> UOUS INTERSTITIAL 2 RECONCILIATION INVENTORY ❑ 3 VADOZE MONITORING ❑ 4 AUTOMAGAUGINTIC TANK ❑5 GROUND WATER 6 ANNUAL TANK <br /> MONITORING ❑ B SIR ❑ 9 WEEKLY MANUAL ❑10 MONTHLY TANK MONITORING TESTING <br /> TANK GAUGING TESTING ❑ 95 UNKNOWN 99 OTHER <br /> V/. TANK CLOSURE/NFORMAT(QA/(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST F( /DAY R) 2.ESTIMATED QUANTITY OF n, <br /> SUBSTANCE REMAINING t✓ 3.WAS TANK FILLED NTH <br /> GALLONS INERT MATERIAL? YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNERS NAME <br /> (PRINTED 8 61GNATUREI <br /> DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> C # JURISDICTION# FACILITY#� _ <br /> STATE I.D:# TANK# <br /> PERMIT NUMBER � 1_J y/z/ L/ <br /> PERMIT APPROVED BY/DATE <br /> RMIT EXPIRATION DATE <br /> THIS FOAM MUST BE ACCOMPANIED BY A PERMIT APPLI ON-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED, FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> FORME (695) <br /> SHOULD BE ACCOMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THEJWGROUND STORAGE TANK REGULATIONS <br />