Laserfiche WebLink
D 5 TO 20 LODI, CA - ADDITIVE TANK ADDITION STANDARD EROSION CONTROL NOTES J <br /> DEMOLITION AND EROSION CONTROL PLAN WHENGWIMALL AND RUNOFF TFAULD DAIEY INSPECTIONSROED OF THE EROSION AND SEDIMENT <br /> gJ' CONTROLS ANO DEIN THE OUTFALLS MUST TI PROVIDED BY SOME ONE KNOWLEOGFOBLE <br /> AND E%PERIENCEO IN THE PRINCIPLES.PRACTCES.INSTPLUTION.AND MMNIENANCE Of n J _ <br /> U C� LEGPND EROSON DO SEDIMENT CONTROLS WHO WORKS FOR THE PERMITTEE. rvR Q <br /> 2. CONSTRUCTION ACTMTIES MUST AMD OR MINIMIZE EXCAVATION AND CREATION OF BARE cf <br /> GROUND GRAM OCTOBER 1 THROUGH MAY 31 EACH YEAR. <br /> L TO&OEMOL5nE0 3. DURING WET WEATHER PERIOD,TEMPORARY STABILIZATION OF THE SITE MUST OCCUR AT THE O O <br /> ��qq /!T END OF EACH WORK DAT. ��"� Q <br /> VC—= f m EfNPRo1E0MN �/� PAYF5AA1EMAi0T OENOLISEN D /(J/, C. SEDIMENT CONTROLS MUST BE INSTALLED AND MNNTAINEO ON ALL GOWN GRPDIENL SIDES OF ¢ O Q U <br /> CC' <br /> KK <br /> THE CONSTRUCTION SIZE AT ALL TIMES DURING CONSTRUCTION.THEY MUST REMAIN IN PLACE <br /> FN AGN_PREA %� I <br /> CLEAR.UMHS UNTIL PERMANENT VEGETATION OR OTHER PERMANENT COVERING OF EXPOSED SOIL Is �W 005 <br /> U � <br /> U ON NCE ESTARLEHED oQ U W <br /> 5. ALL AZT NE INLETS MUST HAVE SEDIMENT CONTROLS INSTALLED AND MNNTNNED AT ALL TIMES Z <br /> DURING CONSTRUCTION.UNLESS OTHERWISE APPROVED,A SURFACE MOUNTED ANO O Q Q J <br /> PERIMETER PROTECTION pnACHABLE.U-SHAPED FUTER BAD IS REQUIRED FOR ALL CURB INLET CATCH&SINS. ka Z F CA O O <br /> EXIFRO DRNNAGE EDWPAM SIGNIFIRT AMOUNTS OF SEDIMENT WHICH LEAVES THE SHE MUST BE CLEANS°UP WITHIN a Q 0 J W <br /> 6 N HOURS AND PLACED BACK ON THE SITE AND STARILIZED OR PROPERLY DISPOSED.THE � e 1ISI <br /> c c L O STORM DRNN INLET PROTECTI01 CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A O F <br /> RECURflFNCE OF THE DISCHARGE WITHIN THE SAME 21 HOURS.\"U A,NHAT C <br /> N / 7. SEDIMENT MUST NOT BE INTENTONALLY WASHED INTO STORM SEWERS,DRNNAGE WAYS,OR <br /> �=N 0 S 0 <br /> M� J Z u WATER BODIES. �u V 5 Q Q i= U <br /> \\ s sv sv sN ! YO sv �� CONSTRUCTION SEGUENCE: B. SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN H HAS u 2 <br /> sv GtFpAMtvmI15'-OIAW ATTEND PaECONsmUCnON MEETING M!H CITY OF LOOT REACHED A HEIGHT OF 1/3ND THE WRIER HEIGHT,ANO PRIOR i0 THE CONTROL MEAEUHA` W (Q <br /> m v iRENCUDFED OUIER Ex. Rlgt J61. REMOVAL. _== N U <br /> \ FROM09;'Et 2. RAG"= <br /> UMI CLEWING OF ALL STRUCTURES WITH SUMPS MUST OCCUR WHEN THE SEDIMENT RETENTIONPAA ?$8 <br /> 3. INSTALL PER METER PROTECnON EMPS AS 1.0.ON PLANS. B RAL TY HAS BEEN REDUCED BY EGA AND AT COMPLETION OF P-ECT. <br /> C +, INSTALL STORM DRAIN UET PROTECTOR AS SHOWN M RANO 10 ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST NCWDE PROPER STOWE, m n g ~ <br /> CO O11 CLEAR AND GRUS STE.CWRETE DEMO TON AID PERFORM ROUGI GRADING APP LALTON, NO 0 Po$ <br /> IN HG 11 THE PERMITTEE MUST PROPERLY MANAGE HAZARDOUS WASTES USED OLS CONTAAIMIED <br /> OO OO DID I. CONSTRUCT 9TE IMPROVEMENTS SOILS,CONCRETE WASTE,SANTARY WASTE,JOUID WASTE,OR OTHER TOXIC SUBSTANCES <br /> `n 2 OO CEA10 PENUIEDIR LOOT fW NAL I AND I'll BRAIN INLET Pa01ECTW. DISCOVERED OR GENERATED DURING CONSTRUCTION. <br /> 12 THE APPLICATION RATE OFMY ]ERS ET RELEASES FROM <br /> FH VEGETATION TILIZEMUST FOLLOW <br /> RS TO <br /> OO OO OO �' MANUFAC RRECOMMENDATIONS. <br /> CURE TERS MUST BE MINIMIZED. ME RELEASE FG DERE SHOULD BEUSED AND REARS <br /> W <br /> - 3 IRM� r SpSuRE TAKEN IN APPUCATTEN OF FERTILIZERS WITHIN ANY WATER WAY RPARLAN ZONE <br /> EX, <br /> J <br /> N <br /> 13.OWNER OR DESIGNATED PERSON S4LL BE RESPONSIBLE FOR PROPER INST—IDN AND < W <br /> 001 <br /> Ex CURS CURB DE HOOT MAINTENANCE OF ALL ERGSION AND SEDIMENT CONTROL MEASURES,IN ACCORDANCE WITH UI Z a) <br /> DEMOLITION CALLOUTS CURRENT CLEAR WATER SERVICES STANDARDS AND STATE,AND FEDERAL REGULATIONS, J 0 <br /> Ww <br /> 14.PRIOR TO ANY LAND DISTURBING ACTIVITIES.THE BOUNDARIES OF THE CLEARING LEARN, O <br /> M RIME! OiECPON AS O NR AND DISPOSED OF OFF4TE ONLr SHOWN ON THE PUN SHLLL BE CLEARLY DELINEATED IN THE MELD.UNLESS OTHERWISE W <br /> A O WPWIi/CONPOCRFF PAKNEHI°i0 6E DENOL5M0 AND DISPOSED Of APPROVED,NO DISTUR&NCE IS PERMITTED BEYOND THE CLEARING LIMITS. QY <br /> WNC 15,PRIOR TO ANY LINO DISTURBING ACTMTIES.THE BMPS THAT MUST BE INSTALLED ARE U J Q <br /> PERIMETER SEDIMENT CONTROL,AND INLET PROTECTION,THESE BMFE MUST BE MAINTAINED Q <br /> CONSTRUCTION FENCE LEAKING LIMITS ONLY © O NXI ro'AS NEACN.=CAT <br /> EOR THE DURATION OF THE PROJECT. U <br /> FMOL5u E TING VNDSWP D mmW! RE/MANTNx IRRIWnON SYSTEM Q <br /> IMPROVEMENTS NEW I s sv TO NEW MED°5Cp EE CONTRACTOR 1FROUTCE ADSMWix CLEAN EWE FOR 16.IF VEGETATIVE SEED MIXES ARE SPECIFIED,SEEDING MUST TAKE PLACE NO LATER THAN <br /> AS NEEDED P .CON <br /> I � i <br /> SEPTEMBER ST:THE TYPE AND PERCENTAGES OF SEED IN TIE MIX ARE AS IDENTIFIED ON O <br /> 2 .AFKAT s O SAN NEE— <br /> AVEICNT THE PLANS OR AS SPECIFIED BY THE DESIGN ENGINEER. U <br /> O 0 CFSSN� TRACTOR D—SUPPLY SNORING OUR.AND IT WATER-TIGHT TRUCKS MUST BE USED i0 TRANSPORT SATURATED SOILS FROM THE <br /> — —_—�E�p_j_—_ S MAT M W!I PERMITS REQUIRED. <br /> „ CONSTRUCTION SDE.M APPROVED APPROPRIATE <br /> LEM IS i0 GRAIN MUS THE SOIL ED SUE AT A <br /> IM N IB. :MAN.SPI LAGETATEp MFA,ONO THROUGH <br /> BMPS;SOIL MUST BE OFNNEO SUFFICIENTLY PER <br /> __—_ �NBOPY IGNITED LOCATION USING APPROPR <br /> IMPL SPILLAGE. <br /> _ 5 L-w _ _ EROSION/SEDIMENT CONTROL CALLOUTS PUMPING OF SEDMENT UDEN WATER MUST BE DISCHARGED OVER AN UNDISNRBEO. �§ <br /> PRE ROUGH A SEDIMENT CONTROL BMP(I.E.FILTER BAC). L� <br /> O O PER ETER PROTECiO ESC PUN MUST SE KEPT ONSITE,&E MEASURES SHOWN ON THE PUN MUST BE YpOFE551 . <br /> + CONTRACTOR i0 INSTALL PERIMETER PROTECTION(SILT FENCE.SANG MSTOILEO PROPERLY i0 ENSURE THAT SEDIMENT UDEN WATER GOES NOT ENTER A SURFACE <br /> A"I BAGS,FILTER BERMS)PER CRT OF LODI STANDARDS AT ALL PERIMETER WATER SYSTEM,ROADWAY,OR OTHER PROPERTIES. <br /> LOCATIONS TO PREVENT SILT-UDEN RUNOFF FROM IFANNG THE 2 NAL P.GRUBS <br /> CONSTRUCTION AREA AND AS DIRECTED BY THE CITYINSPECTOR. :10.THE ESC MEASURES SHOWN ON THIS PLAN ARE THE MINIMUM REDUIREMENTS FDA 67814 <br /> FHAT\\ AN CIPATED SITE CONDITIONS.WRING THE CONSTRUCTION PERIOD. THESE MEASURES SNALL <br /> PAVEMFNT� s v FORM DRNN INLET PROTECTION BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL REWUTIDNS. <br /> Q CONTRACTOR i0 INSTALL WTCN BASIN FILTER BAO PER DETNL THIS 21 WRITTEN ESC LOGS ARE SUGGESTED TO BE MAINTAINED ONLTE AND AVNIABLE TO DISTRICT 6/1., <br /> SHE SHEET,AT DOWNSTREAM INLET—GNs OR AS REQUIRED i0 PREVENT INSPECTORS UPON REQUEST. Sjb f L dA?P <br /> AOJUST CT NECESSARY DURING CONSTRUCTION).OXIMPIIHME SYSTEM ANO/OR OF CAL1E <br /> _——_— N WATER DRUM ENTERING STORM GRA <br /> / -- PION NECESSARY <br /> AREA(PLOUTIOH,CON1RACi0R i0 OTHER MPRWED KATION S.FINE WATER SPRAYING.PUSTIC SHEETNC.MULE ICH MAY <br /> u <br /> AS DIRECTED B!Litt INSPECTOR. 22.IN ARES SUBIEGT i0 WIND EROSION,APPROPRIATE BMPS MUST BE USED WH <br /> = IN THE ARPL CNING,OR Ts 4 <br /> O CONSTRUC MEASURES. <br /> CONTRACTOR TO UTILIZE THIS AREA FOR: 23,ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD, <br /> AS eUILTS 5 S <br /> MATERIAL DEANERY AND STORAGE <br /> —————————————— },� yy CONCRETE WASTE MANAGEMENT-PLACE ON NSOUEEN AND COVER <br /> — ---- I `\ STOCKPILES <br /> �� ORa2 DANDY BAGWII <br /> \ LIR STRAPS & <br /> 2 sT�RM Om CF ~z <br /> IN P Ox <br /> EROSION CONTROL NOTEStzm <br /> DANDY BAG®R <br /> 1 L NECESSARY GOTIPlEM ID MACER I ON—AHD SED NEx�!ECMB ONE <br /> To <br /> FACILITATE D uu R SFAORANCEFIT C I <br /> BMPSI THE�ER/COrtPACTOREN Nr <br /> EMINENT <br /> SNAG-RESTORE Au ERDSKKI CONTROL DMCES MONOFILAMENT <br /> PMH ORDER TO THE <br /> IUNESFACTON OF THE Ott ENGINEER AFTER —DUMPING STRAP -x <br /> GCn SIN- LLOWS FOR EASY <br /> REMOVAL OF CONTENTS DANDY BAG®II GENERAL NOTES <br /> CR�u�uBtt K WOUiRR_NEBr1GR DIG c RAno S x LN—EIlErGi INSTALLATION AND MAINTENANCE GUIDELINES: MR111,1�E AND AINTAIN IRRIunON To THE srz PRm2MENF5 IRmGlwx (GN F <br /> AS <br /> RSWM 10 G� WT W6 <br /> IHSPECTO WE 10 uxC MPLEIED INSTALLATION:REMOVE THE GRATE FROM CATCH BASIN, IF USING OPTIONAL OIL ' <br /> I.a Ounu nACEN ICN D SEE INET cCOOETRUL M�PINES Mapµ1ECT- ABSORBENTS PLACE ADSOIBENT PILLOW IN UNIT STAND THE GRATE ON END. Q <br /> MOVE THE TOP LIFTING STRAPS OUT OF THE WAY AND PLACE THE GRATE INTO THE <br /> MNHINNED. x!FPMALn N u DANDY BAG H SO THAT THE GRATE S BELOW THE TOP STRAPS AND ABOVE THE NOHE!wW 50 FE£!FROM THE TMK 5lORA.CETTH HMWO FE NOt <br /> LOWER STRAPS. HOLDING TIE LIFTING DEVICES INSERT THE GRATE INTO THE INLET. <br /> AS <br /> DEMOLITION NOTES: MAINTENANCE:REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM VICINITY OF CgTECT R ITTARERO 10 <br /> UNIT AFTER EACH STORM EVENT. AFTER EACN STORM EVENT AND AT REGULAR f55 ED ON ACTUAL CONTPACTOt MO DEPTH OF ALL 8 v O v <br /> 1 oGPOTE AND <br /> VERIFlv I PI FOR <br /> orLpUTILN AND <br /> EICTED PoORNiO STMT O w&TOR IMEMALS.LOON INTO THE DPNOY BAG IF THE CONTAINMENT MFA IS MORE mSTMIAnOx T6cxxICDU1Es.&6uFFTHES 'IN.EY PUUL—THE UTHIES AND <br /> THAN I/3 FULL OF TI E CA THE UNIT MUsI eE EMPNED. TO EMPTY ENT,LIFT <br /> OF My OSCRFPANCFS OR INCDMPATAR IIEI WON TIE THE ENIi OUT OF THE INLET USING THE LIFTING STRAPS ANO REMOVE THE GRATE. ilJlpAAysllal'e bBIOW. ! CJ <br /> al <br /> OEAGN. IF USING OPTIONAL OIL ABSORBENTS;REPLACE ABSORBENT WHEN NEAR SATURATION. 0 L ITA0TICALLING R1.FEp ut�cnl6�SH�pwx 0 Tn BEff YiMSRINAE R45ENO 0 u Ox TMKONURN�EO PUBUCA <br /> M°.EiliM nLyON.NonF.RARGH DSEx c0N5ELnNc EN FBRs,INC. CATCH BASIN RLTER BAG Cell before you dig. OBLECT NG e"NRRIATIO"N's 11 CINE eE sHwLD OCCUR.THE caNTRxTOK SHALL s" <br /> 2. Rw [CuIE/PEWECICAiE SLIT�NWRTEHwCESPM JPRWECiAARG TNAT aLy� 2�- IH CWsmUCIOx T SOLVE NL FRODLFMs Pggi To PR«FEDWG S <br />