Laserfiche WebLink
0 1* <br /> UL/ULC Listed Red Thread'', II A Piping System <br /> Lowest Total Cost of Ownerships <br /> Benefits of fMaterial Cost +fnstailation Cost] System Life <br /> Fiberglass Piping in Naintenarce costs and replacement costs not required with RED THREAD IIA piping system. <br /> Underground Fuel <br /> Applications • Thirty-Year Outstanding Corrosion <br /> Warranty*— With Resistance—RED TH R EAD IIA <br /> over 40 years proven piping systems resist internal and <br /> TIME TESTED performance in the external corrosion from hazardous <br /> marketplace, soils,fuels and other corrosive <br /> • 30-Year Warranty Underwriter's fluids. Corrosion resistance is <br /> Laboratories, Inc. and verified by long-term total immersion <br /> • Installed since 1964 )Underwriter's Laboratories testing (I.D. and O.D.)of the <br /> Canada(ULIULC) Listed RED fiberglass systems. Longterm total <br /> • Never been removed due THREAD IIA pipe,fittings and immersion testing is not currently <br /> to fuel incompatibility adhesive carry a 30-year warranty. required by UL 971 for flexible <br /> The product is warranted to be systems. <br /> • Total immersion testing in free from defects in material and <br /> fuels workmanship—and against internal •Quality Assurance—Smith <br /> and external corrosion-when used for Fibercast quality assurance <br /> • Case History G7301 underground transportation of fuels. procedures meet or exceed the <br /> test requirements of U UU LC. <br /> • Leak Prevention—New sump Smkh Fibercast 100%prooftests <br /> entryttermination fittings provide all piping, which exceeds current <br /> positive seal at the sump to help UL requirements. <br /> LOWEST TOTAL COST OF prevent leaking of underground fuel <br /> OWNERSHIP in or out of the <br /> sump.This fitting <br /> • No reinstall costs due to also helps provide <br /> fuel incompatibility Class I (leak ,{ <br /> prevention) � <br /> which <br /> ti <br /> tecon wcxr Nt; <br /> • Homogenous system - pro <br /> no Finer, no bladder, no jacket complieswith <br /> requirement for <br /> continuous f r <br /> interstitial monitoring <br /> of the piping _ <br /> A TRUE PIPE IN A PIPE system's secondary <br /> • Interstitial space containment. • Permeability—RED THREAD IIA <br /> communication • Exceptional Flow permeability resistance greatly <br /> Characteristics— exceeds UL allowable <br /> • Leak prevention, RED THREAD UA pipe has the permeability. <br /> not leak detection largest I.D. in the fueling UL 971 requires permeability <br /> industry—allowing you to sell #wice <br /> the fuel per foot than any 1'!" testing as follows: <br /> • INSTALL IT BURY 1T - 180 days for primary pipe <br /> FORGETIT! flexible product on the market. _30 days for secondary pipe <br /> Three-inch RED THREAD IIA Smith Fibercast permeability <br /> fiberglass pipe has a nominal testing is based on 180-210 days. <br /> 3.36" I.D.;four-inch pipe has a <br /> 4.36" I.D. <br /> 'Please review Smith Fibercast's written warranty to determine the terms and conditions. <br /> 2 <br />