Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 327.04 <br /> Complete the following checklist: <br /> Q Yes No` Is the audible alarm operational? <br /> R1 Yes -1 No' Is the visual alarm operational? <br /> ❑ Yes 0 No" Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 17 Yes No' Were all sensors installed at lowest point of secondary containment and positioned so that Other equipment will not interfere with their <br /> proper operation? <br /> Yes No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> NIA <br /> ❑ Yes i No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> I NIA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> ❑ SumplTrench Sensors; ❑ Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> fail ureldisconnection? ❑Yes; No. <br /> 9 Yes No" For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no mechanical overfill prevention <br /> NIA valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? 90 % <br /> Yes` No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> I Yes` D No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) Product; i Water. If <br /> yes,describe causes in Section E,below. <br /> ❑ Yes No` Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ❑ Yes No` Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Sensors tested: <br /> L2 87 STP Sump Brine mruuvt: DF <br /> L4 91 STP Sump Brine <br /> NOV 0 2 Z016 <br /> L6 Diesel STP Sump Brine <br /> L8 87 Fill Sump Brine ENVIRONMENTAL HEALr, <br /> L1Q <br /> — <br /> 91 Fill Sump Brine DECENT <br /> L12 Diesel Fill Sump Brine <br /> Checked plug and drained Brine from bottom of the sumps above to verify communications <br /> within the sumps Secondary Containment Brine. Got brine sensors alarm. <br /> Removed 87, 91 and Diesel ATG probes to verify/operate the overfill and high product alarms. <br /> Monitor, and outside alarm showed correct alarms. <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />