My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4jE(; tzjVl;-- L) <br /> NOV 422016 <br /> Monitoring System Certification Form: Addendum for Vacuum/PresstENQfhn'� OM'WEALTH <br /> I. Results of Vacuum/Pressure Monitoring Equipment Testing DEPARTMENT <br /> This page should be used to document testing and servicing of vacuum and pressure interstitial sensors.A copy of this form must be <br /> included with the Monitoring System Certification Form,which must be provided to the tank system owner/operator.The <br /> owner/operator must submit a copy of the Monitoring System Certification Form to the local agency regulating UST systems within <br /> 30 days of test date. <br /> Manufacturer: Veeder Root Model: System Type: ❑ Pressure; Q Vacuum <br /> Sensor ID <br /> Component(s)Monitored by this 87 Product Line <br /> S1 <br /> Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: Q Pass; <br /> Component(s) Monitored by this 87 Vent Line <br /> Sensor FunctionalityTest Result: Q Pass; <br /> S2 Interstitial Communication Test Result: E] Pass; <br /> S3 Component(s) Monitored by this 87 Vapor Line <br /> _ Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: Q Pass; <br /> S4 <br /> Component(s)Monitored by this 91 Product Line <br /> ' <br /> Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: Q Pass; <br /> Component(s)Monitored by this 91 Vent Line <br /> 55 <br /> Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: LlPass; <br /> SF Component(s)Monitored by this Diesel Product Line <br /> Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: Q Pass; <br /> Component(s)Monitored by this Diesel Vent Line <br /> S7 <br /> Sensor Functionality Test Result: Q Pass; Interstitial Communication Test Result: ❑ Pass; <br /> Component(s) Monitored by this <br /> Sensor Functionality Test Result: ❑ Pass; Interstitial Communication Test.Result: ❑ Pass; <br /> Component(s)Monitored by this <br /> Sensor Functionality Test Result: ❑ Pass; Interstitial Communication Test Result: ❑ Pass; <br /> Component(s)Monitored by this <br /> Sensor Functionality Test Result: ❑ Pass; Interstitial Communication Test Result: ❑ Pass; <br /> How was interstitial communication verified? <br /> Q Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; ❑ Visual Inspection; <br /> ❑ Other (Describe in Sec. J,below) <br /> Was vacuum/pressure restored to operating levels in all interstitial spaces? <br /> Q Yes ❑ No (If no, describe in Sec. J, below) <br /> J. Comments: S2, S5, S7 still need to finish testing communications. <br /> Page 4 of 5 <br /> If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point <br /> from the sensor,vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br /> 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.