My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1368 East Hazelton Avenue, Stockton { <br /> California 95205-6232 <br /> Telephone: (209)468-3420 Fax: �yz (i• r <br /> (209) 468-3433 Web:www.sov,or /ehd <br /> Underground Storage Tank Pr <br /> Facility Name: Program Inspection Report <br /> Fast Lane Central Valley <br /> Faci+ity Address: <br /> 116 Roth Rd, Lathrop <br /> Date: <br /> Overall Inspection Comments: August 08, 2016 <br /> An inspection checklist was provided to the facility operator on the day of inspection The Environments! Health <br /> Department (EHD) has written the complete report which replaces <br /> Complete and submit a copy of the Return to Compliance Certification <br /> documenting the corrective actions that have been o and any supporting <br /> paces the initis! checklist. <br /> Paperwork, within 30 days of receiving the complete inspection report. <br /> Note: The EHD "accepted" submittals to California Environments! Reporting System (GFRs) on July 21, 2016; thi: <br /> means that the submittals were received, much like receiving mail from the postal service. To date, violations fron <br /> 207, portions of 305, 313, 316, and 319• A response that addresses the <br /> y Include items #: 103,104,105, 106, 201, 203, 204, <br /> Note: S6 sensor fault alarm on June 16, 2016 cleared by June 20, 2016 and has <br /> Note: Vacuum sensor monitoring of time secondary containment Piping of the truck side of the facility of the <br /> se violations is over a month overdue. <br /> the June 17, 2016 inspection have not been addressed; the p <br /> vacuum/pressure/hydrostatic (VPH) system was not tested Burin th se <br /> today. There is epoxy in the plr. <br /> not re-alarmed. <br /> such that the plug cannot be opened without damaging the under dispenser containment. <br /> Note: Automatic tank gauges (ATGs) are used for overfill protection both on the auto and truck <br /> The ATGs were tested today for overfill protection at ninetysides of the facility <br /> (The facility cannot provide documentation that the flappers are et at nn etytfive phe ercent t so aha dee,°f the facility <br /> for Fill Tube Shut-off Valve under Underground Storage Tank(UST) Tank Information for all five USTs ins to No <br /> Note: The service technician reported today that a new siphon jet valve was installed on June 16 2016 o the <br /> diesel south (truck side) line leak detector. n the <br /> Note- Brine appeared to be clear to faintly pink in color in diesel south submersible turbine pump(STP) sump anc <br /> diesel south fill sump on the truck side of the facility; and diesel STP sump,91-product fill sump and 87-product fit <br /> sump on the auto side of the facility. <br /> Note: Communication in the 87-product, 91-product, and three diesel STP sumps and fill sumps and <br /> communication in the under dispenser containment(UDC) sumps of the truck side of the facility were completed <br /> today. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO <br /> THIS FACILITY IS SUBJECT TOREINSPECTION AT ANYTIMEATC HD'S CURRENT HOURL <br /> Received by: <br /> Date: Y RATE <br /> Moi 1 aY "/ inspector: <br /> wJ Inspector Phone: <br /> ai Printed Name and Title: VICKI MCCARTNEY, Senior REHS (209) 468-9852 <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.