My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fast Lane Central Valley, 116 East Roth Rd, Lathrop, CA 95330 6/19/2017 (Auto) <br /> Monitoring System Certification Form: Addendum for Vacuum/Pressure Interstitial Sensors <br /> Y. Results of Vacuum/Pressure Monitoring Equipment Testing <br /> This page should be used to document testing and servicing of vacuum and pressure interstitial sensors.A copy of this form must be included <br /> with the Monitoring System Certification Form,which must be provided to the tank system owner/operator.The owner/operator must submit a <br /> copy of the Monitoring System Certification Form to the local agency regulating UST systems within 30 days of test date. <br /> Manufacturer: Veeder Root Model: System Type: ❑ Pressure; ❑Vacuum <br /> Sensor ID <br /> S1 Component(s)Monitored by this Sensor: 87 Product Line <br /> Sensor Functionality Test Result: ❑✓ Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> S2 Component(s)Monitored by this Sensor: 87 Vent Line <br /> Sensor Functionality Test Result: 21 Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s) Monitored by this Sensor: 87 Vapor Line <br /> S3 Sensor Functionality Test Result: ZPass; ❑ Fail Interstitial Communication Test Result ❑Pass; ❑ Fail <br /> S4 Component(s)Monitored by this Sensor. 91 Product Line <br /> Sensor Functionality Test Result: ®Pass; ❑ Fail Interstitial Communication Test Result: p Pass; ❑ Fail <br /> Component(s) Monitored by this Sensor: 91 Vent Line <br /> 55 <br /> Sensor Functionality Test Result: 0 Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: Diesel Product Line <br /> S5 <br /> Sensor Functionality Test Result: ® Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> S7 <br /> Component(s)Monitored by this Sensor: Diesel Vent Line <br /> - - <br /> Sensor Functionality Test Result: 0 Pass; ❑ Fail Interstitial Communication Test Result: ❑ Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result:❑Pass; ❑ Fail. <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑Pass; ❑ Fail Interstitial Communication Test Result: ❑Pass; ❑ Fail <br /> Component(s)Monitored by this Sensor: <br /> Sensor Functionality Test Result: ❑ Pass; ❑ Fail Interstitial Communication Test Result: El Pass; ❑ Fail <br /> How was interstitial communication verified? <br /> ❑ Leak Introduced at Far End of Interstitial S ace;' ❑ Gauge; ❑ Visual Inspection; ❑ Other Describe in Sec. J,below) <br /> Was vacuum/pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑No (If no, describe in.Sec. J, below) <br /> J. Comments: Can't verify communication on piping runs. <br /> ' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br /> sensor,vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br /> www.unidoes.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.