My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
BILLING 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:04:41 PM
Creation date
11/6/2018 12:55:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2010 - 2012
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\BILLING 2010 - 2012.PDF
QuestysFileName
BILLING 2010 - 2012
QuestysRecordDate
4/25/2018 3:53:11 PM
QuestysRecordID
3867058
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> Mn.. <br /> TYPE OF ACTION ❑ L NEW PLAN V 2.CHANGE OF INFORMATION s1112 <br /> PLAN TYPE Q MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY CHF.FOLLOWING UST SYSTEM(S)'. <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) Mm. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> Fad Lane eeMal Vella M04. C-Y <br /> BU INESS SITE ADDRESS V, L mn <br /> llfiF had - - - <br /> II. EQUIPMENT TESTING AND PREVENTI I TENANCE <br /> Slate law quires that testing preventive maintenance,and calibration of monitoring equipment(e.g.,sen. ,probes,line leak detectors,etc)be perfomled at <br /> the frequen specified by the equipment manufacturcrf instructions,or annually,whichever is more requent,and that such work most be perfumed by <br /> qualified el. <br /> MONITORIN r QUIPMENF IS SERVICED ® 1.ANNUALLY MO6. - 99.OTT (Specify): MW. <br /> III. MONITORING LOC IONS - <br /> This monitoring plan List include a Site Plan showing the general tank and piping layouts and lh ocations where monitoring is performed(1 a location of tach sensor, <br /> line leak detector,mon ring system control panel,etc.). If you already have a diagram(e.g.,c ant UST Monitoring Site Plan fmm a Momtnnng System Certification <br /> form,Hazardous Materia Business Plan map,etc.)which shows all re aired information int de it with this Elan. - <br /> IV.,TANK MO ORING <br /> MONITORING IS PERFOR 'D USM THE FOLLOWING M-I UOD(S)'.(Check all t apply) <br /> 0 I.CONTINUOUS ELECT'R IC MONITORING OF TANK ANNULAR(INTE TITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) MI I <br /> SECONDARY CONTA T IS: ❑ &DRY ❑ b.LIQUID LLED ❑ c.PRESSURIZED X d.VACUUM MI5 <br /> MI5" MODEL#: TLS-350 <br /> PANEL MANUFACTURE Veeder Root <br /> MI4. MODEL#(S): 0194380-340r8iB18YiR011' Mrs. <br /> LEAK SENSOR MAFIUFAC R: Vaeder Raol <br /> ❑ 2.AUTOMATIC TANKGAUGING(A )SYSTEM USED TO MOI TO SINGLE WALL TANK(S) q: Mn. <br /> PANEL MANUFACTUREIU MODEL M19, <br /> IN-TANK PROBE MANUFAC[[JRER. M'6. MODEL#(S): <br /> b.DAILYINIGHTLY ❑ c.WEEKLY M20" <br /> LEAK TEST FREQUENCY: E] &C( <br /> .C TINIJOUS ❑ mzt. <br /> E3 d,MON Y ❑ c.OTHER(Specify): M>z Mz3 <br /> PROGRAMMED TESTS: E] a0.1 g.P.h. b.O.2 g.p.h. ❑ c.OTHER(Specify): WCE] 3.INVENTORY RECONCILIATION ❑ a.MANUAL 'R CR§2646 ❑ It.STATISTICAL PER 23 CCR§2646.1 <br /> 1-] 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 §2645 Mss, <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26. Mir. <br /> TEST FREQUENCY: ❑ a.ANNUAL ❑ b. IE'NNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING: ❑ s_DAILY ❑ It. EKLY MUTT. <br /> ❑ eq OT°IFP(Specity): <br /> V.-PIPE M ITORING, _ <br /> M30.' <br /> MONITORING IS PERFORMED USING THE FOL WINGMETHOD(S)(Check at apply) <br /> I CONTINUOUS MONITORING OF PIPING MP(SyTRENCH(ES)AND OTI SECONDARY CONTAINMENT Mn <br /> SECONDARY CONI'ARNMENT IS. ❑ a.DRY ❑ b.LIQUID FILLE ❑ c.PRESSURIZED W d.VACUUM M35. <br /> PANEL MANUFACTURER: Veedar act - mmeop. MODEL#: 715350 <br /> MW. Ie Oy9438(1-2A8/Fi1IL9 Mas. <br /> r E.1P ScNROR M.A.N!'FACTL. `leader Root _ _ .ODPT.#(S): <br /> WILL A PIPING LEAK ALARM IGGER AUTOMATIC PUMP(i.e.,TURBINE)S WN? ® a.YES [3 In.NO M36M3r <br /> WILL FAILURFEDISCONNIEC N OF THE MONITORING SYSTEM TRIGGER AUTO TIC PUNT SHUTDOWN? ® e.YES C] IT.NO <br /> ® 2.MECHANICAL LINE LEAK DE ECTOR(MLLD) THAT ROUTINELY PERFORMS 3.0 g. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A L IS DETECTED MOs EE#(S)l 991-0.2000 Mas' <br /> MLLD MANUFACTURE VMI <br /> ❑ 3.ELECTRONIC LINE LEAK D CIOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK MOSDEI. S) Met. <br /> ELLD MANUFACTU ' a): M41 <br /> PROGRAMMED IN L E TESTING: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM UAL 0.1 g.p.h. M43 <br /> s.YES ❑ b.NO <br /> WILL ELLD DIEON OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUT OWN? ❑ a.YES ❑ IT.NO Ma. <br /> WILL ELLO FAIL ISCONNF.CTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ 4.INTEGRITY TEST M45. kl G <br /> TEST FREQ CY: ❑ a.ANNUALLY ❑ IT.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> c.MIN.MONTHLY&.EACH TIME TEMOPERATEDa Mar. <br /> ❑ S.VISUAL MONI RING: ❑ a DAILY ❑ b.WEEKLY ❑ «sanrrs�m xsc 5zszeLslbH3) <br /> •Alloxred rm mdtilorblg ofunbuded am for Nal '"nBadY De <br /> ❑ 6.SUCTION PI G MEETS EXEMPTION CRITERIA PER 23 CCR§2636(aH3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTFD TO THE UST(s) Mae. - <br /> ❑ <br /> 99.OTHER(Specify) <br /> hwfwm-d(9/24/04).114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.