Laserfiche WebLink
SEMCO <br />431AWO Hatch Road, Modesto, CA;357. CLIEM'S COPY <br />1741 lie Street, San Mateo, C464402 <br />General & Engineering Contractors, Lic. No. 449864 A, B, C--67., & D-40 <br />Modesto Office ( 209) 5P4-9653 FAX ( 2 09) 524-0503 <br />San Mateo Office (415) 572-•8033 FAX (415) 572-9734 <br />TOLL. FREE 1-800-533-9293 <br />We heeby submit specifications and estimates for the following- <br />- Pre tare tank: removal applications and process required permits. <br />- Coordinate hazardous materials inspector, fire depattment, and state <br />certified laboratory fon- soil testing. <br />- Pump residual fuel from tanks, disconnect electrical and plumbing, <br />triple rinse, and provide dry ice in preparation for tank: removal. <br />- Dispose of residual fuel and rinsate liquids (up to 600 gallons) <br />as hazardous waste, :..ender- manifest by a licensed hazardous waste <br />hauler. <br />- Excavate and remove one (1) 10,000 gallon diesel, one (1) 8,000 <br />gallon motor oil, and two (2) 7,500 gallon diesel underground storage <br />tanks. <br />- Provide crane service, load, transport, and dispose of tanks and <br />miscellaneous equipment per state and local codes. <br />- Backfill hole with approved material and compact by use of hydraulic <br />compactor to insure proper compaction. <br />- Resurface excavated area to match existing grade and gravel sur -facie. <br />- Clean job site and dispose of debris. <br />• In the event of contaminated soil, caving, high water -table, or - <br />add tional work, an estimate shall be given in advance. <br />• Act;al costs of permits and soil test fees by Owner-. <br />u <br />• If nderground tank: installation is elected, deduct $1,500 for use of <br />soil for backfill. <br />* Dom' the project, we recommend that the Owner- or his represent- <br />ati a be on site or available by telephone_. <br />We hereby propose to furnish labor and materials complete in accordance <br />with the above specifications, for the sum of $19,750.00 with payment <br />to be made as follows: 80% after tank removal, and 20% upon completion. <br />Authorized <br />Signature oQ n <br />Richard Hamilton, Vice -President <br />Note: This proposal may be withdrawn by us if not accepted within 30 <br />days <br />Acceptance of Proposal: The above specifications, condi.ti.ons, and <br />prices are hereby accepted. You are authorized to do the work: as <br />specified. Payment will be made as outlined above. <br />Authorized <br />Date: Signature: <br />P R O P O S A L NO. 1046 <br />SUBMITTED TO: J <br />DESCRIPTION OF JOB: <br />H & 11 TRANSPORT <br />UNDERGROUND TANK REMOVAL_ <br />_ 707 ROTH ROAD �- <br />LOCATION: 707 ROTH ROAD �- <br />FRENCH CAMP, CALIFORNIA 95321 <br />FRENCH CAMP, CALIFORNIA 95231 <br />ATT <br />NTION., BETTY C:ENBRANO�-�PHONE: <br />1.-982-ir28I DATE: 5-17 91 <br />We heeby submit specifications and estimates for the following- <br />- Pre tare tank: removal applications and process required permits. <br />- Coordinate hazardous materials inspector, fire depattment, and state <br />certified laboratory fon- soil testing. <br />- Pump residual fuel from tanks, disconnect electrical and plumbing, <br />triple rinse, and provide dry ice in preparation for tank: removal. <br />- Dispose of residual fuel and rinsate liquids (up to 600 gallons) <br />as hazardous waste, :..ender- manifest by a licensed hazardous waste <br />hauler. <br />- Excavate and remove one (1) 10,000 gallon diesel, one (1) 8,000 <br />gallon motor oil, and two (2) 7,500 gallon diesel underground storage <br />tanks. <br />- Provide crane service, load, transport, and dispose of tanks and <br />miscellaneous equipment per state and local codes. <br />- Backfill hole with approved material and compact by use of hydraulic <br />compactor to insure proper compaction. <br />- Resurface excavated area to match existing grade and gravel sur -facie. <br />- Clean job site and dispose of debris. <br />• In the event of contaminated soil, caving, high water -table, or - <br />add tional work, an estimate shall be given in advance. <br />• Act;al costs of permits and soil test fees by Owner-. <br />u <br />• If nderground tank: installation is elected, deduct $1,500 for use of <br />soil for backfill. <br />* Dom' the project, we recommend that the Owner- or his represent- <br />ati a be on site or available by telephone_. <br />We hereby propose to furnish labor and materials complete in accordance <br />with the above specifications, for the sum of $19,750.00 with payment <br />to be made as follows: 80% after tank removal, and 20% upon completion. <br />Authorized <br />Signature oQ n <br />Richard Hamilton, Vice -President <br />Note: This proposal may be withdrawn by us if not accepted within 30 <br />days <br />Acceptance of Proposal: The above specifications, condi.ti.ons, and <br />prices are hereby accepted. You are authorized to do the work: as <br />specified. Payment will be made as outlined above. <br />Authorized <br />Date: Signature: <br />