My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1995 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
BILLING 1995 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:15:02 PM
Creation date
11/6/2018 12:58:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1995 - 2007
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\707\PR0505735\BILLING 1995 - 2007.PDF
QuestysFileName
BILLING 1995 - 2007
QuestysRecordDate
6/28/2018 9:53:29 PM
QuestysRecordID
3930061
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pi goon e c <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD Q <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �, p° <br /> r <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED D <br /> DBA OR FA6ILITY NAME WHERE TANK IS INSTALLED: <br /> �1. TANK D SCRIPTION CQMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN. OWNER'S TANK L 0.X B. MANUFACTURED BY: �! <br /> C. DATE IN TALLIED(MO/DAY/YEAR) �� C D. TANK CAPACITY IN GALLONS: <br /> 11.TANKCONTENTS IFA-115MARKED,COMPLETE)TEMC. <br /> A i MOTOR VEHICLE FUEL ❑ 4 OIL 8. C. ❑ UNLEADED 1a REGULAR 3 DIESEL ❑ 6 AVIATION GAS <br /> 4 GASAHOL <br /> ❑ 2 PETROLEUM ❑ 90 EMPTY 1 PRODUCT ❑ IbPREMIUM <br /> 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.A <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF, �1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER El 96 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL 3 FIBERGLASS ❑ 4 STEEL CLAD W!FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE Y❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING I <br /> IS LINING MATERIAL COMPATIBLE WITH 1009 METHANOL? YES, NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP E�r4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER OE <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) �' OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV. PIPING INFORMATION CIRCLE A]F ABOVE GROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION AU-y 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)ArV 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELWICOATING kDa 100% METHANOL COMPATIBLEW/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> INT RSTITIAL <br /> D. LEAK DETECTION F:] 1 AUTOMATIC LINE LEAK DETECTOR [—] 2 LINE TIGHTNESS TESTING ❑ 3 MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION ,( <br /> Fj 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑] 6 TANK TESTING 7 INTERSTITIAL MON ITOR ING ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES E] NQ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, 1S TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED d SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# m ❑� �: "7 P -; �� <br /> PERMIT NUMBER PERMITAPPROVED BY/DATE PERMIT EXPIRATION DATE S <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORM 8 (12 91) <br /> FILE THIS FORM WiT LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STOR GE TANK REGULATIONS <br /> FOA00346-R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.