My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
BILLING 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:16:23 PM
Creation date
11/6/2018 1:03:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\707\PR0505735\BILLING 2008 - 2015.PDF
QuestysFileName
BILLING 2008 - 2015
QuestysRecordDate
6/28/2018 11:46:54 PM
QuestysRecordID
3930653
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (One form per fncdily) <br /> -�, TYPE OF ACTION ❑ I.NEW PLAN [$ 2.CHANGE OF INFORMATION ani. <br /> I. FACILITY INFORMATION <br /> FACILITY i (ageary uaa onr3� <br /> BUSINESS AME(Same tee FACILITY NAME) <br /> Trans-System Inc... I <br /> BUSINESS S TE ADDRESS mn <br /> 707 E Roth Rd cl French Camp, CA Rai. <br /> L SPILL CONTROL AND CLEANUP METHODS <br /> This pian ad resses unauthorized releases from UST systems and supplements the emergency response plans and pracedwes in rhe facllit}•'s Homrdous Materials <br /> Business Pian <br /> D If safe to In so,facility personnel will take immediate measures to control or stop any release(e.g.,actinic pump shut-off,etc.)and,if necessary,safely remove <br /> mnmining bawling materiel from the UST system. <br /> I> Any going 1C to secondary containment will be pumped or otherwise removed within a time comislent with the ability of the secondary containment sstem to <br /> contain it hamrdam material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hamnious materials,unless stily <br /> I suitable <br /> for their i ended use,will be managed as itamrdum waste. <br /> t Absorbent material will be used to contain and clean up manageable spills of hnmrdous materials- Absorbent material which has became too saturated to he <br /> elrective which is no longer intended tar use will be managed as hamrdous waste wiless a waste determination in accordance with 22 CCR§6626111 finds that <br /> it is man- out. Used absorbent material, remable or waste, will be stored in o properly labeled and sealal contain�r. Waste anterial shall be disposed <br /> upproprial ly. <br /> D Facility lit mutual will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with any <br /> hnmrdous miteried.if rte wamr is contaminated,it will be managed as hamrdous Waste unless awash:determination in accordance with 22 CCR k66262.11 finds <br /> that it is n u-hamrdous. if the water has u pcirolcuto sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow c 'ors. Water(hanudoha or non-homrdaus)I'mm sumps,spill cantainers,ea,will not be disposed to storm wear systems. <br /> D We Will re law secondary containhnent systems for possible deariomdon if any of the following conditions occur: <br /> 1. Hann ous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secon ary containment is prone to damage fart any equipment used to ranave or clean up lamrdmus material collected in sacondnry eamainmenG <br /> 3. Hair ous material,other Than the product/waste stored in to primary containment system, is placed inside secondary eonege nmeat to treat or neutralize <br /> mleas producawaste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III: SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC M1 AINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's liamrdous Materials Business Plan. This <br /> equipment is imputed al least monthly,and after each use,supplies are replenished as neaded. Defective equipment is repaired or mplaccd as necessary. <br /> E UIPMEN NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Com Ictc and if licablc) <br /> EQUIPMENT LOCATION Al'AILABILITI' <br /> Spill control Kif ala Fuel Island-Spill Barrel ma. one tin. <br /> Safety Cones RI'' North end - Fuel Island R2' <br /> Seven art. <br /> Cautlori Tae R12. Fuel Island S ill control Brl " One Roll U3. <br /> Garden Hose R11 Fuel Island spill control Brl R=r One mai. <br /> Shove R'a Fuel Island spill control Br R'-a One <br /> Kitty Litter R15' South End Fuel Island 'm <br /> One Barrel <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Run. TITLE RsI, <br /> Ste a Tucker Regulatory Compliance Manager <br /> NAME R+r. TITLE Rat. <br /> Sz m Abu ndis Shop Manager <br /> NAME R+— TITLE as+. <br /> Ray Gallegos Terminal Manager <br /> NAME Rai. TITLE Ric. <br /> V. MONITORING INDICATORS <br /> IFMONITORTNG INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS To VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> I$Additional system testing or data collection 6(Inspection by qualified persons ❑Recalibration of equipment <br /> Other: 1.The F nch Camp Flre Dept will be called direct and 911 <br /> 2.If spill is due to break in any pan of the storage or dispensing system the emergency shutoff switch will be turned off and then Rsa. <br /> implementation of all other actions to slop the now. <br /> -" 3.If the ipill involves a breach in the inner tank wall or any piping downstream from the tank,San Joaquin county public health services <br /> wI ll b Relined. <br /> UST Response P on(3/2088)-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.