Laserfiche WebLink
CITY COUNCIL THOMAS A. PETERSON <br /> EVELYN M.- City Manager <br /> CITY OF LODI <br /> OHN R. R ndy)SNIDER Mayor ALICE M. REIMCHE <br /> Mayor Pro Tempore CITY HALL, 221 WEST PINE STREET City Clerk <br /> DAVID M. HINCHMAN CALL BOX 3006 RONALD M. STEIN <br /> JAMES W. PINKERTON, Jr. LODI, CALIFORNIA 95241-1910 City Attorney <br /> FRED M. REID (209) 334-5634 <br /> TELECrOPIER:(209)333-6795 _ <br /> December 3, 1987 Q <br /> DEC 71987 <br /> Mark Newfield ENVIROMENTAL HEALTH <br /> P.O. Box Q FERMIT/SERVICES <br /> Woodbridge, CA 95258 <br /> SUBJECT: Request to Excavate Contaminated Soil to a Depth of 33 Feet at <br /> 107 N. School Street <br /> The City Manager asked me to respond to your attached letter of November 15, <br /> 1987. The City of Lodi is not in a position to approve or disapprove your <br /> proposed concept outlined in your letter for removal of contaminated sail . <br /> However, for an excavation to a depth of this magnitude, the City would <br /> require a grading permit per the requirements of Chapter 70 of the 'Uniform <br /> Building Code. If you do desire to excavate, the Building Department will <br /> issue a grading permit under the following conditions: <br /> 1. Submittal of a plan prepared by a civil engineer showing: <br /> A. Site plan including property lines; structures on the property <br /> and adjacent properties; curb, gutter, sidewalk; street <br /> B. Proposed limits of excavation area <br /> C. Method of excavation <br /> D. Method of protecting existing buildings, curb, gutter, <br /> sidewalk, street improvements, and adjacent property <br /> E. Proposed method of backfill and backfill requirements <br /> F. How pedestrian traffic will be rerouted and/or protected <br /> G. How storm water will be handled during winter months <br /> H. If groundwater is contacted, how it will be handled. <br /> Once the City receives the excavation plan, there may also be need for an <br /> encroachment permit if work is to be done in the public right of way (no <br /> cost for this permit) and there may be an insurance requirement and the <br /> posting of a bond to guarantee that the work is completed properly. <br />