Laserfiche WebLink
A) Total Or snic Va ars <br /> I 101 <br /> A direct reading photoionization detecti or, conDcentration) meter FsNofPorganic <br /> or equivalent) will be used to monitortakent least once <br /> vapors in the Mork area. Measurementssubsurfabe sampleacollection, <br /> every 15 minutes during surface <br /> The meter will be calibrated for benzene. Total organic <br /> vaporof <br /> measurements will be used to determine the appropriate <br /> respiratory protection and conditions for site evacuation. <br /> in Total <br /> organic vapor concentrations in the workers breaathifgozan uprde one level e to <br /> of 1a ppm above background will ztn��o�centragiarrs ir► excess of 250 <br /> level C Protection. Breathing o <br /> ppm will stop the work onsite until the work zone concentrations are <br /> reduced to below 250 ppm. <br /> EMPLOYEE TRAINING AND INFORMATION d the <br /> ous <br /> All personnel working have complete <br /> e <br /> waste training course, and have been trained tin�the ed 4�allowiflhour klfollowing <br /> o Workers are aware of potential hazards they <br /> may encounter. <br /> o Knowledge and skills necessary to perform the <br /> work with minimal risk to works health and safety. <br /> o Familiarization with the Site Safety plan and <br /> site-specific requirements. <br /> The training plan for this site encompasses: <br /> o Potential physical and chemical health hazards. <br /> o Respiratory protection, rationale, use, maintenance <br /> and fit testing- <br /> 0 Protective clothing, use and maintenance. <br /> o Entry, exit and decontamination procedures. <br /> o Documentation and record keeping procedures. <br /> 4 <br />