My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
2300 - Underground Storage Tank Program
>
PR0502341
>
REMOVAL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 4:15:46 PM
Creation date
11/6/2018 1:29:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1991
RECORD_ID
PR0502341
PE
2381
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SEVENTH\15615\PR0502341\REMOVAL 1991 .PDF
QuestysFileName
REMOVAL 1991
QuestysRecordDate
8/18/2017 7:30:56 PM
QuestysRecordID
3593346
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN �pAQU I N r.,O C',AL. HE2°s-�T H D I S`TR I.CT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum a :ative ofinative sterion ogilsrbeneaed thctheUtank©spliance. Sail <br /> samples collected shall berepresent depth <br /> invert [tank's bottom] acoe tiion <br /> hprizednReleaseXnotificationemust beffilledmouttand <br /> is documented during closure anUnaut <br /> submitted to SJLNA within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT^ -- <br /> ___ TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Lill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> an <br /> 10,001 gallons d up THREE OR MORE Ends and Middle or <br /> r g per tank �3enerall spaced along <br /> the length of the tank <br /> Piping 'ONE EVERY 20 LINEAL FEET <br /> WATER IS PRESENT IN TANK PIT <br /> NIMUM NUMBER <br /> TANK SIZE MINIMUM NO. OF SAMPLEFS TION OF IL- OFIWATER SAMPLES <br /> SOIL .--- <br /> 10,000 GALLONS From wall next to <br /> OR LESS tank ends at soil/ ONE <br /> (Single Tank) TWO groundwater <br /> interface <br /> From wall next to ONE <br /> ltt 'o 00 GALLONS tank enTHANds at soil/ <br /> OR groundwater <br /> TAMC CLUSTER FOUR interface -- <br /> OTHER SPECT A.L. CONL7I T I ONS <br /> SLAB PRESENT IN TANK PIT qq <br /> Soil samples shall he a obtained <br /> dred inath orderthe <br /> toslab <br /> collectwithin <br /> thesamplestive ils.[PhysicalPenetration <br /> removalhofuthe <br /> the obstruction will be q <br /> obstruction will then allow sampling according to the above conditions. ) <br /> - TANK SIZE - � MINIMUM NUMBER OF _ rLOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons `THREE per tank Center and ends or sides <br /> 1.000 - 10,000 gallons FIVE per tank Center and ends or sides <br /> 10,001 gallons and up FIVE OR MORE per Ends and Middle and <br /> tank general) spaced along <br /> the length of the tank <br /> EH 23 047 12/88 <br /> REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.