Laserfiche WebLink
ARCADIS Ms. Kathryn Dominic ' <br /> August 24, 2010 <br /> Refemnces: <br /> ARCADIS. 2009. Phase II Field Investigation Work Plan. January 6. ' <br /> . 2010. Addendum to the Phase II Field Investigation Work Plan. February 9. ' <br /> California Code. 2009. Health and Safety Code, Division 20 (Miscellaneous Health <br /> and Safety Provisions), Chapter 6.5 (Hazardous Waste Control), Article 9.5 (Surface ' <br /> Impoundments), Sections 25208 through 25208.17 (Toxic Pits Cleanup Act of 1984). <br /> http://www.leginfo.ca.gov/cgi-bin/d isplaycode?section=hsc&group=25001- <br /> 26000&file=25208-25208.17 ' <br /> California Regional Water Quality Control Board, San Francisco Region (RWQCB- <br /> SF). 2008. Screening for Environmental Concerns at Sites with Contaminated Soil , <br /> and Groundwater. Revised May. <br /> Terranext, 1997a. Phase III Bioremediation Report, Southern Pacific Transportation ' <br /> Company, Tracy Yard, Tracy, California. January 30. <br /> . 1997b. TPH Position Paper, Southern Pacific Transportation Company, ' <br /> Tracy Yard, Tracy, CA. May 5. <br /> Industrial Compliance, 1992. Results of Water Sampling at the Engine House ' <br /> Service Pit. Nov 20. <br /> . 1994a. Remedial Investigation (RI) Report, Southern Pacific ' <br /> Transportation Company, Tracy Yard, Tracy, California. May 2. <br /> 1994B. Feasibility Study(FS) Report, Southern Pacific ' <br /> Transportation Company, Tracy Yard, Tracy, California. May 2. <br /> United States Environmental Protection Agency(US EPA). 2009. ProUCL Statistical ' <br /> Software. http://www.epa.gov/esd/tsc/software.htm#ProUCL <br /> 1 <br /> Page: <br /> 12/12 ' <br />