My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1987
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
2300 - Underground Storage Tank Program
>
PR0231253
>
REMOVAL REMOVAL 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:57 PM
Creation date
11/6/2018 2:00:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1987
RECORD_ID
PR0231253
PE
2381
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SONORA\110\PR0231253\REMOVAL 1987 .PDF
QuestysFileName
REMOVAL 1987
QuestysRecordDate
8/21/2017 9:57:05 PM
QuestysRecordID
3598417
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. l`-' C r O <br /> r <br /> Name of Supplier,Owner or Dealer Address No,and Streets) City State Date of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> zC L Station Chart <br /> �Iw By most accurate <br /> m Nominal Capacity capacity chart available— ® Tank Manufacturer's Chart <br /> ti Identity by position Gallons Gallons I � <br /> M u Company Engineering Data <br /> C-"149 Is there doubt as to True Capacity? F_j Charts supplied with PPtrA jl�t? <br /> �_ Brand and Grade See Section"DETERMINING TANK CAPACITY" ElOther rAs TESTER <br /> =� 17. FILL-UP FOR TEST Stick Pleadings Total gallons <br /> to Ye in. gallons ea.Reading <br /> Stick Water Bottom �� <br /> before Fill-up Inventory <br /> to Ye in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OLIANTITY 1Ji-I r P <br /> -" II- -P a 792 <br /> Tank Diameter Product in full tank(up to fill pipe) Q <br /> © PO 0 <br /> w 0 ©Q 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 5 1 <br /> VAPOR RECOVERY SYSTEM <br /> �= x (n <br /> 7. 9 6L <br /> O 0 See manual sections applicable.Check below and record procedure in log(26). `l stage I <br /> CAP; `, V <br /> A to a Water in tank Q High water table in tank excavation Q Line(s)being tested with LVLLT Stage II <br /> CS� N 37 <br /> o=, om <br /> N 21. TEMPERATUREIVOLUME FACTOR (a)TO TEST THIS TANK <br /> © 19. TANK MEASUREMENTS FOR <br /> N TETT ASSEMBLY Is Today Warmer?lj Colder?I� F Product in Tank_ F Fill-up Product on Truck F Expected Change( + or — ) <br /> I <br /> cn Bottom of tank to Grade*.................... 3/21_" <br /> w 22. Thermal-Sensor readingafter circulation <br /> 1 Add 30"for 4"L .................. digits Neared <br /> � <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change_ /Z2/ <br /> Total tubingto assemble A © <br /> Approximate ........ digits <br /> 20. EXTENSION HOSE SETTING 24. _ 6 x D o o 6,(76 Wit) gallons • <br /> qiztotal quantity in coefficient of expansion for ' volume change in this tank <br /> Tank top to grade`............. L full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more <br /> below lank top ....................... ..... 25. 1 6zls 3 /6 <br /> _ � <br /> This is <br /> volume change per°F(24) Digits per*Vin test Volume change per digit. test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. "LUME MEASUREMENTS M 34' 39• <br /> TEMPERATURE COMPENSATION 38•NET VOLUME ACCUMULATED <br /> LUG OF TEST PROCEDURES PRESSURE RECORD TO.1101 GAL USE FACTOR(a) CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27. 28. 29. standpipe Level 32. Product in Product 35. 36. 37. Temperature At High level record <br /> DATE Inches E Record details of setting up Reading Graduate Replaced j-) Change Computation Adjustment Total End Deflection <br /> Thermal Higher+ <br /> and running test (Use full Mo. 10 x (a) = Volume minuseginning Levei to Sensor Lower- Expansion + At Law Level cam ute <br /> length of line if needed.) p Expansion(+]or p <br /> TIME of which BaEon After Product Reading (c} Contraction- Contraction{-] Change per Hoar <br /> (24 hr.) Reading Restored Reading Reading Recovered(+} c, M33(vi—N37(T] INFPA criteria) <br /> b oo e Q I <br /> C C t fe- <br />
The URL can be used to link to this page
Your browser does not support the video tag.