My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEVENSON
>
3507
>
2300 - Underground Storage Tank Program
>
PR0232520
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:07:25 PM
Creation date
11/6/2018 2:18:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0232520
PE
2381
FACILITY_ID
FA0004056
FACILITY_NAME
WILLIAM VALLINCIA
STREET_NUMBER
3507
STREET_NAME
STEVENSON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3507 STEVENSON AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\STEVINSON\3507\PR0232520\REMOVAL 1993 .PDF
QuestysFileName
REMOVAL 1993
QuestysRecordDate
10/12/2017 3:35:03 PM
QuestysRecordID
3676165
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLINOPROTOCOL FOR ROUTINE TANK REOOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> //�pti�281U�Yu, WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> Rjk.J < 1,000 1 per Tank Fill OR Pump End of Tank <br /> j� 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 71 1 Sample every 20 lineal feet <br /> ff) K5 =TANK PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> ;7- !'t- It <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> # (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soiV groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK I TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> - 7 <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.