My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1625
>
2300 - Underground Storage Tank Program
>
PR0502895
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:26:26 AM
Creation date
11/6/2018 2:30:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0502895
PE
2381
FACILITY_ID
FA0005608
FACILITY_NAME
HD Supply Waterworks Ltd
STREET_NUMBER
1625
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
St
City
Lodi
Zip
95240
APN
062-050-11
CURRENT_STATUS
02
SITE_LOCATION
1625 S Stockton St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STOCKTON\1625\PR0502895\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
10/6/2017 4:46:34 PM
QuestysRecordID
3668996
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � Esoo. es <br /> STATE OF CALIFORNIA a `t <br /> STATE WATER RESOURCES CONTROL BOARD ;� <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B � � o, <br /> m• � '.Idr . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM "°""•� <br /> MARK ONLY ❑ I NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: RO-Tile Inc. , Lodi <br /> kKi- <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.0.a S. MANUFACTURED BY: Unknown <br /> C. DATE INSTALLED(MO/DAY/YEAR) unknown D. TANK CAPACITY IN GALLONS: 1000 <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. O. ❑ 1aUN REGULAR EADED 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY ® i PRODUCT 1b PREMIUM 4 GASAHOL 7 METHANOL <br /> ❑ ❑ <br /> ® 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN E] UNLEADED 5 JET FUEL 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED Tolulene C.A.S.x: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ® 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ® 1 BARE STEEL 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING n 6 UNLINED ❑ 95 UNKNOWN E:] 99 OTHER <br /> LININ <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP © 2 COATING 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) none OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) none <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A® 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A0 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION AO 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION <br /> A U 95 UNKNOWN p U 99 OTHER <br /> 0. LEAK DETECTION ❑ I AUTOMATIC LINE LEAK DETECTOR ® 2 LINE TIGHTNESS TESTING ❑ 3 MONBORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING E_] 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> 8 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYIYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES <br /> ❑ NO 1..1 <br /> 04 92 SUBSTANCEREMAINING 20 GALLONS INERTMATERIAL7 4Y <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME fSDATE [� <br /> (PRINTED b31GNAlLRE)Berl• Thompson —��— <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D.# <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> 3 7 I I I I <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> • • r/�� FORD q5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.