My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:57 PM
Creation date
11/6/2018 2:38:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STOCKTON\239\PR0231482\COMPLIANCE INFO 1994-2010.PDF
QuestysFileName
COMPLIANCE INFO 1994-2010
QuestysRecordDate
9/25/2017 6:59:08 PM
QuestysRecordID
3647880
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 23 06 08: 17pM e Dotten 20-533-2650 p. 4 <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested 11 <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer Industry'Standard Professional Engineer <br /> ® Other(Spec)lncon <br /> Test Method Used: ©Pressure ❑vacuum ® Hydrostatic <br /> ❑Other (Spec) <br /> Test Equipment Used: Incon STS Equipment Resolution: 0.0001" <br /> 42 <br /> ..� Spill Box#DF1 Spill Box#REG Spill B,.ox#DF2 Spill Box# <br /> Bucket Diameter: 12" t2" 12" <br /> Bucket Depth: 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and None None None <br /> starting test: <br /> Test Start Time: 14:34 14:34 13:04 <br /> Initial Reading A): 1.8779 1.7882 2.4192 <br /> Test End Time: 14:49 14:49 13:19 <br /> Final Reading(R,:): 1 1.8768 1.7876 2.4196 <br /> Test Duration: 15 min 15 min 15 min <br /> Change in Reading(R,:-R,): 0.0011 0,0006 0.0004 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 <br /> Criteria: _ <br /> Test Result: Pass ❑Fail M Pass ❑ Fail Z Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include irrformuliun on repairs made prior to testing and recommendedfollow-up for failed tests) <br /> DF3 would not pass until we retightened the fillcap adapter. The start time was wrong for DF1 and Reg. We had not <br /> set the system clock until after the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.