Laserfiche WebLink
Jan 23 06 08: 17pM e Dotten 20-533-2650 p. 4 <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested 11 <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer Industry'Standard Professional Engineer <br /> ® Other(Spec)lncon <br /> Test Method Used: ©Pressure ❑vacuum ® Hydrostatic <br /> ❑Other (Spec) <br /> Test Equipment Used: Incon STS Equipment Resolution: 0.0001" <br /> 42 <br /> ..� Spill Box#DF1 Spill Box#REG Spill B,.ox#DF2 Spill Box# <br /> Bucket Diameter: 12" t2" 12" <br /> Bucket Depth: 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and None None None <br /> starting test: <br /> Test Start Time: 14:34 14:34 13:04 <br /> Initial Reading A): 1.8779 1.7882 2.4192 <br /> Test End Time: 14:49 14:49 13:19 <br /> Final Reading(R,:): 1 1.8768 1.7876 2.4196 <br /> Test Duration: 15 min 15 min 15 min <br /> Change in Reading(R,:-R,): 0.0011 0,0006 0.0004 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 <br /> Criteria: _ <br /> Test Result: Pass ❑Fail M Pass ❑ Fail Z Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include irrformuliun on repairs made prior to testing and recommendedfollow-up for failed tests) <br /> DF3 would not pass until we retightened the fillcap adapter. The start time was wrong for DF1 and Reg. We had not <br /> set the system clock until after the test. <br />