My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:57 PM
Creation date
11/6/2018 2:38:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STOCKTON\239\PR0231482\COMPLIANCE INFO 1994-2010.PDF
QuestysFileName
COMPLIANCE INFO 1994-2010
QuestysRecordDate
9/25/2017 6:59:08 PM
QuestysRecordID
3647880
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ddmk <br /> SAN JOAQUIWOUNTY ENVIRONMENTAL HEALTH <br /> UNDERGROUND STORAGE TANK ARTIIENT <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION I.NEW PLAN <br /> PLAN TYPE El 2-CHANGE OF INFORMATION <br /> ❑ MONITORING IS IDENTICAL FOR ALL UST'AT THIS FACILITY. Mor <br /> (Check one item only) [] THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): L102. <br /> FACILITY ID#(Agency Use Only) L FACILITY INFORMATION <br /> FACILITY NAME <br /> FACILITY SITE ADDRESS q M03. <br /> La©aI IN . CIT <br /> II. EQUIPMENT TESTING 11 1,AND FRE ��. Mos <br /> State law requires that testin Preventive VENTIVE MAINT ANCE <br /> accordance with the equipm g tmanufacture s'instructions,or calibration <br /> annually �vhiche ver is ore frequent.(e.g Such work must bepe line <br /> leak Performed <br /> ct rual qualified b personnel. in '0106. <br /> MONITORING EQUIPMENT IS SERVICED <br /> .ANNUALLY q p rs©noel. <br /> ❑ 99.OTHER(Specify): L007. <br /> This monitoring plan must include a Site Plan showing the genera <br /> l tank p Rg j Ciou sI.00ATI�}NSan t e locations re monitoring is erfo <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram e. <br /> form,Hazardous Materials Business P]an ma ,etc.}which shows all re uirvd information,include it US this Ian. c p fuzed(1.8.,location of each sensor, <br /> ( g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOAD�(vSC1MONITORING <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENTNlio <br /> SECONDARY CONTAINMENT IS: N"a.DRY FJb.LIQUID FILLED VAULT(S) <br /> PANEL MANUFACTURER: N ❑ c•UNDER PRESSURE ❑ d. UNDER VACUUM mil <br /> LEAK SENSOR MANUFACTURER: L012. MODEL#: <br /> �v�c-O lf1 N114 M13. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SNGLE WALL TANK(51 MODEL#(S): M15 <br /> PANEL MANUFACTURER: <br /> . <br /> IN-TANK PROBE MANUFACTURER: M16MODEL#: M17_ <br /> M1a. <br /> LEAK TEST FREQUENCY: ❑ a,CONTINUOUS MODEL#(S): L1151. <br /> ❑❑ <br /> d.MONTHLY b.DAILY/NIGHTLY ❑ c.WEEKLY Loo❑ <br /> PROGRAMMED TESTS: C.OTHER(Specify): M21. <br /> ❑ a.0.1 g.p.h. <br /> ❑ b.0.2 g.p,h. ❑ c.OTHERecifY)S <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ( P M=' Mzs. <br /> 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645§ ❑ b.STATISTICAL PER 23 CCR§2646.I Mea. <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 11425 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY <br /> ❑ c.OTHER(Specify): M26 M27 <br /> 06.VISUAL MONITORING DONE: 19 a.DAILY ❑ b.WEEKLYires Re uagency <br /> El99.OTHER(Specify): ( qappravaq <br /> M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Cheek all that apply) <br /> M30 <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)(FRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ C.UNDER PRESSUREM3f <br /> PANEL MANUFACTURER: M32 ❑ d.UNDER VACUUM <br /> MODEL#: M33 <br /> LEAK SENSOR MANUFACTURER: Mia. MODEL#(S): Mss. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO M36 <br /> WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M37 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> FA <br /> ODUCr FLO W WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): M38 MODEL#(S): Mae. <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g,p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40 MODEL#: <br /> gra 1 <br /> PROGRAMMED LINE INTEGRITY TESTS: F-1 a.MINIMUM MONTHLY 0.2 h. '142 <br /> g�p• ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ a.YES ❑ b.NO L143. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br /> ❑ <br /> [34, INTEGRITY TESTING ❑ a.YES b.NO L144 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS <br /> ❑ c.OTHER(Specify) Mas_ Mab. <br /> ❑ <br /> 5-VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-- M47 <br /> *Requires agency approval -Allowed ror monitoring or unburied emergency generator fuel piping <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> '2636(a)(3)only per HSC§25281 5(b)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> M48 <br /> S3CEHD-d(07103)-114 <br /> 07123/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.