My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
2300 - Underground Storage Tank Program
>
PR0501034
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2021 4:41:07 PM
Creation date
11/6/2018 3:12:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0501034
PE
2381
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> IWO Chevron U.S.A. Inc. <br /> 2410 Camino Ramon,San Ramon,California•Phone 141518429500 <br /> 11.1.1 MMM P0.am 50114.San Ramon,G 94503 0004 <br /> Marketing Operations <br /> 0.Moller October 31, 1988 <br /> Drvivpn Menapu,0p..1W. <br /> S.L.Panermn <br /> Area Manger,opera[,= <br /> C.G.Trimbach <br /> Mavape,.fnpinee:in9 <br /> Ms. Diane Hinson <br /> San Joaquin Local Health District <br /> 1601 E. Hazelton St. p lll,I <br /> Stockton, CA 93203 NO <br /> Re: Former Chevron Station Jl9-1918 101 •apr <br /> Nvi�/ 8 <br /> 43 E. Harding Way ap?M/It/, AL <br /> Stockton, CA /6ERV�C S iM <br /> Dear Ms. Hinson: <br /> We plan on closing the tank hole at the subject site starting Wednesday <br /> November 2, 1988. Attached are the certified analytical results. As you <br /> can see at 20' in the hole, Total Petroleum Hydrocarbons as Gasoline range <br /> from ND to 6240 ppm. We have excavated to the limit of our equipment. <br /> The open tank hole continues to be a safety hazard which we would like to <br /> eliminate. If additional soil clean-up is required, we will treat it in-situ. <br /> This will be determined by the installation of soil borings/monitoring wells. <br /> On August 9, you forwarded a draft of the approval of the workplan for the <br /> installation of 3 soil borings/monitoring wells. We will incorporate your 8 <br /> considerations into the work plan. Based on the information we have on the <br /> tank hole, we propose to add 3 additional borings to the work plan. All <br /> approved protocol will be followed. Attached is a groundplan showing <br /> locations of all wells. <br /> The paperwork allowing our consultant to release data to you was forwarded <br /> to in August. If you need additional clarification, please call Kay Huffman <br /> at (415)842-9602. - <br /> Very truly yours, <br /> D. MOLLER <br /> By �,ll t(.�!,•,. <br /> Kay Nuffmaln,Engineer <br /> K H:Jt:XK 1-52 <br /> Attachment <br /> cc: Mr. Doug Selby <br /> EA Engineering <br /> 41A Lafayette Circle <br /> Lafayette, CA 94549 <br />
The URL can be used to link to this page
Your browser does not support the video tag.