Laserfiche WebLink
t4. Chc-- Rbc Poole h0 srackroJ CA q /1•a � <br /> Name of Gupplier.Owner or Dealer Address No,and Straet(e) City Sdte Date of Test <br /> y� 15. TANK TO TEST 16. CAPACITY From <br /> Fh Station Chan <br /> rt �} By most accurate 9gd �l Tank Manufacturer's Chart <br /> mO Nominal Capacity / O O O capacity chart available �' <br /> Identity by position Gallons Gallons Company Engineering Data <br /> A Is there doubt as to True Capacity 7 <br /> S O ❑ Chars supplied with pu TOP <br /> h —a era and Grade See Section"DETERMINING TANK CAPACITY" Other <br /> _v 17. FILL-UP FOR TEST Suck Readings Total Gallons <br /> to Va in. Gallons ea.Reading <br /> Stick Water Bottom <br /> before Fill-up O •• _ O Inventory <br /> to K in. Gallons <br /> a <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter �!�8 Product In full tank(up to fill pipe) c:r/ a�$ ._ `7 13 L L <br />�0 . a <br /> C: m-4 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 53 ` -0 ?W VAPOR RECOVERY SYSTEM <br /> _ X (n 54 O a <br />•O n 0 See manual sections applicable.Check below and record procedure in log(26). ` Stage I <br /> j 1 0 ❑ Water In tank ❑ High water table In tank excavation Line(s)being tested with LVLLT Stage H <br /> lyo0m <br /> 0 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR Is lode warmer?❑ Colder? p <br /> 1 <br /> TSTT ASSEMBLY Y f7—°F Product in Tank—°F Fill-up Product on Truck—°F Expected Change( + or - ) <br /> 0 Bottom of tank to Grade*. 1 v-lO / b $O. 9 1 <br /> 0 - - 22. Thermal-Sensor reading after circulation °F <br /> Add 30"for 4"L ................. _" digits Nearest <br /> Add 24"for 3"L or air sae[....... 23. Digits per°F in range of expected change 3 y 4 <br /> ' Total tubing to assemble Approximate ........ /160 n digits <br /> 20. EXTENSION HOSE SETTING 24. 9 82G X ,000561. SO —5. y7/Idt. $ gallons <br /> Tank top to grade*......... q total quantity in coefficient of expansion for volume change in this tank <br /> -- - d9/ I full tank(16 or 17) Involved product3 i Z per°F 07 0 176 3 5 6�.0173 <br /> Extend hose on suction tube 6"or more <br /> below tank top ..................................... /O 25. -C)17'/.:?39f.o17L/) This is <br /> volume change per°F(24) Digits per*F In test Volume change per digit. test <br /> *If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. VOLUME BEASURENEIM PO 34. TFYPEAAIDAE COMPENSATION 36.NET VOLUME 39.ACCUMULATED <br /> LOS OF TEST PROCEDURES PRESSURE RECORD EO.WI GL. ZAT FAC10R PEI CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27. 26. - 29. Standpipe!awl 32. 35. 36. 37. Tampiatun At Nip Lna road <br /> BATE Record details of setting U in Inches Product in Product Change Compptetioo Adjustment Vaal End oaMeerr <br /> A P Neaaap Graduate Replaced I-I <br /> Thermal Higher+ (a) n lel= Vdume Minus <br /> and running test.(Use full M. Beginning lent to Samor lewrt- Expansion+ Expansion + or At tw taw ceapne <br /> TINE length of line if needed.) of which Before After Purdue Reading c Contraction- W I 1 camp cer Hew <br /> let Contraction I-I <br /> (24"1 Reading Rutend grading Rudinp R¢onred(+) a33(V)-e371T) (eFM crxeria) <br />