Laserfiche WebLink
14. %Cvco 918 -)'Q A) CA <br /> Name of Supplier.Owner or Dealer Address No.and Streets) City State Data of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> xl y N Station Chart <br /> �. By most accurate pp <br /> v~mi 0 <br /> 6..-r Nominal Capacity 1 0y 000 capacity than available gV/t' Tank Manufacturer's Chart <br /> -+ Identity by Dasition Gallons Gallons <br /> � N Company Engineering Data <br /> Is there doubt as to TCapacity?C/E Q Q rueapac <br /> E Charts supplied with F_*tr0 The <br /> hBrand and Grade See Section"DETERMINING TANK CAPACITY" E Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to K in. Gallons ea.Reading <br /> Stick Water Bottom rJ <br /> before Fill-up _ 0 Inventory %1 1/5 <br /> to Ve In, Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY Ts° f s- 10 <br /> imal <br /> WAi C2 — 0 <br /> Tank Diameter WA Product in full tank(up to RR pipe) <br /> 000 <br /> t 0 0 m • 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 5$' @ C1 VAPOR RECOVERY SYSTEM <br /> X �/� <br /> 00> See manual sections applicable.Check below and record procedure in log(26). 5 Z O oOb Stage I <br />•Z In <br /> i I � Water In tank High water table in tank excavation Lines)being tested with LVLLT Stage U <br /> ID0m <br /> 0 <br /> 0 21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR <br /> ri TSTT ASSEMBLY Is Today Warmer?(I Calder?I F Product in Tank_°F Fill-up Product an Truck F Expected Change( +or - ) <br /> of Bottom o1 tank to Grade* 3 8 14 86,6- 8 3' '04 <br /> a? - 22. Themtal-Sensor reading otter circulation °F <br /> Add 30"for 4"L ................. _" digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range o1 expected change 301/ <br /> Total tubing to assemble Approximate ........ / O „ digit. <br /> 20. EXTENSION HOSE SETTING , 1 24. _9 a x . 000695 166- =6.%3 -J 43R I ! gallons <br /> �"7 -� �� total quantity In coefficient of expansion for volume change in this tank <br /> Tank d ho grade'.....tube <br /> 6....more ............. full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more <br /> below tank top ......... ............ .............. /o " 25. e? jj6q AZA + _eno4 = 0.0171�57 :�0193) Thisis <br /> volume change per°F(24) Digits per°F in test Volume change per digit. test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26• 30. HYDROSTATIC 31. VOLUME MEASUREMENTS M 34. TEMPERATURE COMPENSATION 38.NET VOLUME 39. ACCUMULATED <br /> LOG OF TELT PROCEDURES PRESSURE RECORD TO.Ott RAL. USE FACTOR h) CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27. 28. 29. standpipe Lure l 32. 35. 36. 37, Temperature At Nip used record <br /> DUE in Inches Product a Product Chan <br /> Record details Of saltire u pe Computation Adjustment row w DaMceon <br /> A l hotels Graduate RapIUaA l-1 Thermal Nigher+ (c) a (al' Volume Minus <br /> end running test.(Use full Ia Beginning level to Seeaor Lower- Ex anaion+ At Loa LNN aonpute <br /> .TNF length of line I(needed.) el which Brion After Product Reading t Contraction- Contraction <br /> n I ) come por Hoar <br /> (H InX Reeding Restored Reading Reading Roca...d f+l 1 1 Conmaion 1-) (NEPA criteria) <br /> d371V1—#37j) <br />