Laserfiche WebLink
Stantec <br /> Quarterly Status Summary Report-Second Quarter 2012 <br /> ARCO Service Station No. 4932 <br /> August 7, 2012 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP Affiliated Company, for the express purpose <br /> stated above. Any re-use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec. To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prep red by: Reviewed by: <br /> Kimber Collins Catherine Francini <br /> Project Scientist Project Manager <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: S\ONAL GF0`o <br /> a BRIAN D. 6) <br /> WESTHOFF � <br /> Brian Westhoff, P.G. No,8784 <br /> Senior Geologist <br /> TFO�0A1.��aF <br /> August 7, 2012 <br /> cc: Mr. James Barton, California Regional Water Quality Control Board - Central Valley Region <br /> Mr. Sergio Morescalchi, ARC, a BP Affiliated Company (Upload to Enfos) <br /> Upload to Geotracker <br /> 4932 QSSR 2Q12.doc 5 <br />