My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002729
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:36:18 AM
Creation date
11/6/2018 3:21:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002729
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C ® R <br /> Date August 1, 2005 <br /> Quarter 2Q05 <br /> ' ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4932 Address 16 E Harding Way, Stockton, CA <br /> ' ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 77BP 54932 06 0346 <br /> ' Primary Agency/Regulatory ID No San Joaquin County Public Health Seances(SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO 41 <br /> WORK PERFORMED THIS QUARTER (Second Quarter— 2005)• <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Prepared and submitted monthly groundwater discharge reports <br /> 4 Operated and maintained soil vapor extraction and groundwater extraction remedial system "1 <br /> ' 5 Installed offsite ozone sparge systems <br /> WORK PROPOSED FOR NEXT QUARTER (Third Quarter— 2005)• <br /> 1 Perform quarterly groundwater monitoring and sampling �a <br /> 2 Operate and maintain soil vapor extraction and groundwater extraction remedial system <br /> ' 3 Prepare and submit quarterly groundwater monitoring report <br /> 4 Begin operation of the offsite ozone sparge system <br /> 5 Prepare and submit monthly groundwater discharge reports <br /> ' 6 Prepare and submit report documenting ozone sparge well and ozone system installation <br /> 7 Operate and maintain offsite ozone sparge wells and ozone sparge remedial system <br /> i <br /> 1 <br /> h <br /> fS"t� <br /> t <br /> i <br /> a�t <br /> yk+ <br /> 11BP-ARC0149321QMRs12005VQMR05 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.