Laserfiche WebLink
S E C ® R <br /> Date August 1, 2005 <br /> Quarter 2Q05 <br /> ' ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4932 Address 16 E Harding Way, Stockton, CA <br /> ' ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 77BP 54932 06 0346 <br /> ' Primary Agency/Regulatory ID No San Joaquin County Public Health Seances(SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO 41 <br /> WORK PERFORMED THIS QUARTER (Second Quarter— 2005)• <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Prepared and submitted monthly groundwater discharge reports <br /> 4 Operated and maintained soil vapor extraction and groundwater extraction remedial system "1 <br /> ' 5 Installed offsite ozone sparge systems <br /> WORK PROPOSED FOR NEXT QUARTER (Third Quarter— 2005)• <br /> 1 Perform quarterly groundwater monitoring and sampling �a <br /> 2 Operate and maintain soil vapor extraction and groundwater extraction remedial system <br /> ' 3 Prepare and submit quarterly groundwater monitoring report <br /> 4 Begin operation of the offsite ozone sparge system <br /> 5 Prepare and submit monthly groundwater discharge reports <br /> ' 6 Prepare and submit report documenting ozone sparge well and ozone system installation <br /> 7 Operate and maintain offsite ozone sparge wells and ozone sparge remedial system <br /> i <br /> 1 <br /> h <br /> fS"t� <br /> t <br /> i <br /> a�t <br /> yk+ <br /> 11BP-ARC0149321QMRs12005VQMR05 doc <br />