Laserfiche WebLink
1 <br /> SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date � , G <br /> Time of Amval , <br /> Techniaan Time of Departure <br /> Site Engineer -Rusty Benkosky Was Site Engineer contacted from field? Yes No <br /> PART A.GENERAL INFORMATION <br /> Site Location _ARCO 4932,16 Hardina Way.Stockton Project No 778P 54932 030335 ' <br /> Abatement Equip Thenniech Vac 50 -500 cfm Thermal/Catalytic Oxidizer Serial No <br /> SVE Blower 20 HP Travini 411 with Choke Max AMP Raung <br /> TelemeWAA <br /> MAX AMP Rating <br /> Electrical Power30� V 3 phase—200 amo <br /> Supplemental Fuel 5 psi Elect.Meter Reading <br /> No of WO barrels at site Full Supp Fuel Meter Reading <br /> Empty <br /> PART B.SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E <br /> f!3 ) 1 <br /> Hourmeter Reading ` At time 1 0 <br /> 1) <br /> P <br /> Before Ad ustment After Ad ustment <br /> valve ntvrer�tLM29}— <br /> blaw+ar motor�Flow(A P,In H2O) <br /> fte U L� t�j ,1101/ (i <br /> Well Rctd Air Flow(d p,In 1.120) , <br /> size f '7 a� <br /> Dilution Air Fbw(d P."H20) <br /> Size <br /> Ii} 'FID Data <br /> S tem Influent my ell Diel 3 <br /> S tem Influent v Air Stri 1 ' <br /> System Effluent (g)MV)U 0 v <br /> Field Instrument Used last Calibrated , <br /> 1 <br /> Completed 8 Date <br />