My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002732
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:32:31 AM
Creation date
11/6/2018 3:25:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002732
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R <br /> • Dake October 25, 2004 <br /> Quarter 3Q04 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4932 Address 16 E Harding Way, Stockton, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR/Rusty Benkosky <br /> Consultant Project No 77BP 54932 04 0336 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services (SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO <br /> WORK PERFORMED THIS QUARTER (Third Quarter- 2004) <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Prepared and submitted monthly groundwater discharge reports <br /> 4 Operated and maintained soil vapor extraction and groundwater extraction remedial system <br /> 5 Continued with weekly batch extraction events in offsite remedial wells <br /> 6 Connected offsite extraction well EW-7 to the remedial system and brought well online <br /> 7 Obtained access to adjacent Taco Bell property for ozone system remedial compound installation <br /> 8 Submitted encroachment permit package to the City of Stockton for off-site ozone well installations <br /> I <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth Quarter- 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Operate and maintain sod vapor extraction and groundwater extraction remedial system <br /> 3 Prepare and submit quarterly groundwater monitoring report <br /> 4 Continue with weekly batch extraction events in offsite remedial wells <br /> 5 Prepare and submit monthly groundwater discharge reports <br /> 6 Submit permits for offsite ozone sparge system Installation <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling MW-1 through MW-11, EW-1 through EW-7, DMW-1 <br /> through DMW-3 and SVE-1 Sampled quarterly <br /> Frequency of Groundwater Monitoring Quarter) <br /> Is Free Product(FP) Present Onsite No <br /> Current Remediation Techniques SVE/GWE (onsite), Batch Extraction offsite <br /> TPHg removed this quarter(lbs) 262 (SVE), 6 7 GWE <br /> MtBE removed this quarter(lbs) 90(SVE), 6 0 (GWE) <br /> TPHg removed -cumulative(lbs) 23,566 5 SVE + GWE <br /> iMtBE removed-cumulative (Ibs) 19714 (SVE +GWE) <br /> Groundwater extracted this quarter 203,800 (GWE), 11,650(Batch Extraction) <br /> I IARC0W9321QMRs120M3QMR04 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.