Laserfiche WebLink
A l <br /> 1 <br /> �� II <br /> 1{ I• � <br /> S E C ® R <br /> Ms Lori Duncan <br /> February 9, 2004 <br /> Page 2 <br /> d <br /> TAME, 1,2 DCA, TBA and EtBE This work was summarized in SECOR's report titled Site <br /> Assessment Report dated November 6, 2000 <br /> Routine groundwater monitoring continues to suggest these constituents are present at actionable <br /> levels and LPH has been detected in wells MW-4 and SVE-1 Groundwater flow direction beneath <br /> the site has been consistently mapped to the northeast at gradient ranging from 0 004 to 0 04 ft/ft <br /> During February 2001, SECOR performed DPE testing at the site to assess DPE technology as a <br /> feasible remedial alternative for mitigating hydrocarbon-Impacted soil The results of the feasibility <br /> test are as follows <br /> • The five-day DPE test produced vapor extraction flow rates ranging between 32 7 and <br /> 99 2 scfm, from MW-4 and SVE-1, and at vacuum pressures ranging between 5 5 to 25 <br /> Inches of water column from MW-4 and SVE-1 x,f <br /> • Based on the responding Induced vacuums up to 89 feet away, the calculated radii of <br /> Influence for the test ranged between 46 7 feet and 89 2 feet ; <br /> • During the test approximately 544 3 pounds of TPHg, 19 5 pounds of benzene, and 440 <br /> pounds of MtBE were extracted from the soil beneath the site, as calculated from <br /> laboratory results and field FID readings that consistently exceeded 10,000 ppmv ,a <br /> . The test activities and findings were summarized in SECOR's report titled Interim RemediationlMulti- , <br /> Phase Extraction Feasibility Test Report dated May 4, 2001 <br /> During July 2001, West Hazmat Drilling (West Hazmat)of Rancho Cordova, California advanced two <br /> soil borings and installed five groundwater monitoring wells to further Investigate the lateral and <br /> vertical extent of petroleum hydrocarbons in sod and groundwater beneath the site Soil borings SB-1 <br /> and SB-2 were drilled to 80 feet and 78 feet bgs, respectively Wells MW-5 through MW-9 were <br /> completed at 40 feet bgs Results of the Investigation indicated that the vertical extent of petroleum !P <br /> hydrocarbons including MtBE in soil was vertically defined beneath the site by deep borings SB-1 and <br /> SB-2, and off-site by the borings for wells MW-5, MW-7, and MW-8 The presence of MtBE in the <br /> deepest soil sample collected from the boring for well MW-6 (8 2 mglkg) suggested that additional Q <br /> investigation for vertical off-site delineation was warranted Based on groundwater analytical results, <br /> SECOR concluded that the lateral extent of TPHg and benzene had been defined by wells MW-5 <br /> through MW-8, however the presence of MtBE in groundwater samples collected from well MW-6 <br /> and depth-discrete groundwater samples from boring SB-2 confirmed that further lateral and vertical '' <br /> delineation of the dissolved MtBE plume was required within these areas SECOR further <br /> concluded that the presence of TPHg and benzene in upgradient well MW-9 suggested that an <br /> additional source(s) of petroleum hydrocarbons might be present in the area Results of this <br /> Investigation are documented in SECOR's Additional Site Assessment Report, dated November 9, <br /> 2001 <br /> rY <br /> In the 3`d Quarter 2001, LPH was discovered in wells SVE-1 and MW-4 Upon discovery, SECOR rt� <br /> notified the SJCPHS and initiated weekly LPH removal SECOR performed weekly LPH removal until y , <br /> the LPH was no longer present(six weeks) <br /> In 2001, SECOR conducted a door-to-door survey of businesses and residences in the area to <br /> Identify any water supply wells within a 500-foot radius of the site A questionnaire was supplied to <br /> those businesses or residences that could not be contacted first hand Based on review of verbal k <br /> and written survey results returned to SECOR, there were no water supply wells confirmed within a <br /> 500-foot radius of the site According to the SJCEHD in a letter dated November 21, 2000, two water <br /> All <br /> 11ARCO\49321workpians\Revised IRAP&WP doc <br />