My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002735
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:55:52 AM
Creation date
11/6/2018 3:28:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002735
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> S E C ® R <br /> Ms Lori Duncan <br /> February 9, 2004 <br /> Page 4 <br /> E <br /> and were installed with a 2-inch PVC well casing screened from 77 to 82 feet bgs Extraction well <br /> (EW-2) was completed at 43 feet bgs, and was installed with a 6-inch PVC well casing with a <br /> stainless steel wire-wrap screen extending from 20 to 40 feet bgs Wells DMW-2, DMW-3, and EW-2 1 <br /> are located off-site north across E Harding Way from the site " <br /> In August 2002, SECOR submitted a Problem Assessment Report (PAR), which evaluated various <br /> remedial alternatives for the site SECOR recommended the installation of a groundwater extraction <br /> (GWE) and soil vapor extraction (SVE) system The recommendation included the installation of five <br /> additional GWE (EW-3 through EW-7) wells and one additional SVE (SVE-2) well to be utilized as <br /> groundwater extraction and soil vapor extraction wells Proposed groundwater extraction and soil I_ <br /> vapor extraction were located both on and offsite San Joaquin County approved the remedial <br /> recommendations in their letter dated November 7, 2002 <br /> ONSITE REMEDIAL ACTION s <br /> All onsite remedial wells were installed by November 2002 and remedial system installation at the site <br /> was initiated in January 2003 Installation of underground conveyance piping including groundwater .: <br /> extraction and soil vapor extraction piping, electrical conduit, well head connections to all onsite <br /> remedial wells, and remedial equipment was completed by March 2003 Pacific Gas and Electric <br /> completed the installation of natural gas in May 2003 Remedial system start-up and shake down was <br /> completed in May 2003 with official remedial start-up on June 14, 2003 <br /> ' <br /> The remedial system currently consists of a soil vapor extraction (SVE) system and groundwater a <br /> extraction system (GWE) The SVE system consists of a Thermtech Vac 50 thermal oxidizer <br /> connected to wells SVE-1, SVE-2, MW-1, MW-2, MW-4, and EW-1 The groundwater extraction <br /> system consists of submersible extraction pumps in wells EW-1 and EW-6 connected to an air Y' <br /> stripper and three 2000 lbs granular activated carbon vessels prior to discharge to the City of <br /> Stockton sanitary sewer Discharge of groundwater to the sanitary sewer is permit through the City of <br /> Stockton Municipal Utilities Department and permit to operate the thermal oxidizer was issued by San " <br /> Joaquin Valley Air Pollution Control District <br /> z <br /> To date the sod vapor extraction system has removed 20,138 pounds (lbs) of TPHg, 90 lbs of rya <br /> benzene, 1,680 lbs of MtBE The groundwater extraction system has pumped 183, 200 gallons of <br /> water at an average pumping rate of 0 8 gpm To date the groundwater extraction system has 4 <br /> removed 74 8 lbs of TPHg, 3 15 lbs of benzene, and 88 2 lbs of MtBE Sod vapor and groundwater <br /> extraction system performance data is included in Tables 2 and 3 <br /> ,r <br /> CONNECTION OF OFFSITE REMEDIAL WELLS AND SUMMARY OF CURRENT <br /> OFFSITE INTERIM REMEDIAL ACTION <br /> Connection of offsite groundwater extraction wells EW-2 through EW-5 and EW-7 to the groundwater <br /> extraction system and EW-3 and EW-4 to the soil vapor extraction system was proposed by SECOR <br /> in the Problem Assessment Report dated August 29, 2002 SECOR obtained a revocable and A <br /> encroachment permit from the City of Stockton to complete the installation of the offsite extraction <br /> wells, a horizontal boring required to cross Harding Way and trenching to connect the wells SECOR <br /> completed the installation of the offsite wells in August 2003 Subsequent installation of the <br /> horizontal boring beneath Harding Way and connection of the offsite wells to the onsite remedial <br /> system has not been completed for the following reasons k <br /> 11ARC0149321workplans\Revised IRAP&WP doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.