My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002738
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:45:10 AM
Creation date
11/6/2018 3:29:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002738
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rG ty <br /> ATTACHMENTS: <br /> . • Table 1 - Groundwater Elevation and Analytical Data <br /> • Table 2-Fuel Oxygenates Analytical Data <br /> • Table 3-Groundwater Gradient Data <br /> • Table 4—Batch Extraction-Total Groundwater Volume Removed <br /> • Table 5—Batch Extraction Groundwater Elevation Data <br /> • Figure 1 -Groundwater Elevation Contour Map—Shallow Water Bearing Zone <br /> • Figure 2—Groundwater Elevation Contour Map—Deep Water Bearing Zone <br /> • Figure 3—Groundwater Chenucal Concentration Map <br /> • Figure 4—MtBE Isoconcentration Contour Map—Shallow Water Bearing Zone <br /> • Figure 5—MtBE isoconcentration Contour Map-Deep Water Bearing Zone <br /> • Figure 6-Groundwater Elevation Contour Map-Before Batch Extraction May 30,2002 <br /> • Figure 7-Groundwater Elevation Contour Map-After Batch Extraction May 30,2002 <br /> • Figure 8- Groundwater Elevation Contour Map-Before Batch Extraction June 21,2002 <br /> • Figure 9-Groundwater Elevation Contour Map-Before Batch Extraction July 3,2002 <br /> • Figure 10-Groundwater Elevation Contour Map-After Batch Extraction July 3,2002 <br /> • Figure 11 -Groundwater Elevation Contour Map-Before Batch Extraction July 18,2002 <br /> • Figure 12- Groundwater Elevation Contour Map-After Batch Extraction July 18,2002 <br /> • Figure 13 -Groundwater Elevation Contour Map-Before Batch Extraction August 2,2002 <br /> • Figure 14-Groundwater Elevation Contour Map-After Batch Extraction August 2,2002 <br /> • Figure 15 - Groundwater Elevation Contour Map-Before Batch Extraction August 12,2002 <br /> • • Figure 16-Groundwater Elevation Contour Map-After Batch Extraction August 12,2002 <br /> • Figure 17 -Groundwater Elevation Contour Map-Before Batch Extraction August 29, 2002 <br /> • Figure 18- Groundwater Elevation Contour Map-After Batch Extraction August 29,2002 <br /> • Figure 19- Groundwater Elevation Contour Map-Before Batch Extraction September 11,2002 <br /> • Figure 20-Groundwater Elevation Contour Map-After Batch Extraction September 11,2002 <br /> • Attachment A-Field and Laboratory Procedures <br /> • Attachment B -Certified Laboratory Analytical Reports,Cham-of-Custody Documentation,and Field <br /> Data Sheets <br /> cc Mr Marty Hartzell,Regional Water Quality Control Board-Central Valley Region(RWQCB-CVR) <br /> Ms Lori Duncan,SJCPHS <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.