Laserfiche WebLink
1!� <br />concentrations ranging from 12 ppb (MW -3) to 93 ppb (DMW-1) Chemical concentrations were generally consistent <br />with historical data except for increased concentrations of analytes in well SVE-1 Free product was not present at this <br />site Groundwater elevations across the site increased by an average of 103 ft Groundwater flow was to the northeast <br />at an approximate gradient of 0 002 ft/ft, which is generally consistent with historical data <br />Interim remediation by groundwater batch extraction was performed at this site on March 18, April 19, April 29, and <br />May 13, 2002 A total of 7,500 gallons were extracted from wells MW -1, MW -4, MW -6, SVE-1 and EW -1 during <br />these extraction events Groundwater extraction data is presented in Tables 4 and 5 Groundwater elevation contour <br />maps for before and after each event are presented as Figures 4 through 11 The contour maps from after extraction <br />show a localized cone of depression around well EW -1 Groundwater batch extraction events have continued to be <br />scheduled after May 13, and will be reported on in the third quarter 2002 monitoring report Field Data Sheets are <br />included in Attachment B <br />This report presents our understanding of existing conditions at the subject site The conclusions contained herein <br />are based on the analytical results, and professional Judgment in accordance with current standards of professional <br />practice, no other warranty is expressed or implied SECOR assumes no responsibility for exploratory borings or <br />data reported by other consultants or contractors <br />ATTACHMENTS: <br />• Table 1 - Groundwater Elevation and Analytical Data <br />• Table 2 - Fuel Oxygenates Analytical Data <br />• Table 3 - Groundwater Gradient Data <br />• Table 4 — Batch Extraction -Total Volume Removed from Wells MW -1, MW -4, MW -6, SVE-1, and EW - <br />1 <br />• Table 5 — Batch Extraction Groundwater Elevation Data <br />• Figure 1 - Groundwater Elevation Contour Map <br />• Figure 2 - Groundwater Concentration Map <br />• Figure 3 — MtBE Isoconcentration map <br />• Figure 4 - Groundwater Elevation Contour Map -Before Batch Extraction March 18, 2002 <br />• Figure 5 - Groundwater Elevation Contour Map -After Batch Extraction March 18, 2002 <br />• Figure 6 - Groundwater Elevation Contour Map -Before Batch Extraction April 19, 2002 <br />• Figure 7 - Groundwater Elevation Contour Map -After Batch Extraction April 19, 2002 <br />• Figure 8 - Groundwater Elevation Contour Map -Before Batch Extraction April 29, 2002 <br />• Figure 9 - Groundwater Elevation Contour Map -After Batch Extraction April 29, 2002 <br />• Figure 10 - Groundwater Elevation Contour Map -Before Batch Extraction May 13, 2002 <br />• Figure 1 i - Groundwater Elevation Contour Map -After Batch Extraction May 13, 2002 <br />• Attachment A - Field and Laboratory Procedures <br />• Attachment B - Certified Laboratory Analytical Reports, Cham -of -Custody Documentation, and Field <br />Data Sheets <br />cc Mr Marty Hartzell, Regional Water Quality Control Board - Central Valley Region (RWQCB-CVR) <br />Ms Lori Duncan, SJCPHS <br />t <br />