Laserfiche WebLink
Aquifer Testing Work Order 2 <br /> ' Tosco 602 11400 Merritt St Castroville CA <br /> -January 18 2002 <br /> ' bgs) from bottom and install transducer/data logger Note pump depth below Tie datalogger <br /> and pump together Data logger should be installed above the Pump Put tape on the data <br /> logger to mark where the cable should sit DO NOT DISTURB DATA LOGGERS ONCE THEY <br /> ARE INSTALLED. Record depth of data loggers below <br /> ' Depth of Pump and Logger(RW-1)- - 29 <br /> Depth of Logger(MW-1): _ <br /> ' Depth of Logger(MW-4): <br /> Depth of Logger(MW-6): <br /> ' Depth of Logger(MW-7) _-a 7-e <br /> Need to,get 24-hours worth of static depth to water readings Using data loggers, water levels will <br /> ' be continuously recorded in the extraction well and observation wells at set 1-minute Intervals <br /> (see below) <br /> 6) Check computer to make sure that water levels are being recorded Data loggers should <br /> be measuring DTW at 1-minute intervals Check settings by connecting the logger to the <br /> laptop via the enclosed cable and click on "get settings". It should show the well ID and <br /> ' Interval at the top. If the interval is different, click on "setup"and change It at the bottom <br /> Also, CLEAR THE MEMORY If possible for each data logger, prior to setting them in the <br /> wells. <br /> ' 7) Following Installation of the data loggers,periodically check depth to water measurements In <br /> pumping well and observation wells about 3 times during the day to confirm baseline DTW <br /> readings to make sure the data loggers are working <br /> 8) Set up for the next days 3-Hour Step Drawdown Testing (Extraction Well RW-1). Plumb <br /> discharge to holding tank with in-line flow meter <br /> ' 9) Record initial flow meter totalizer reading-SG.!; allons <br /> NOTE- Make sure that data loggers are recording data for the wells <br /> DAY 2 APRIL 2 2002—STEP DRAWDOWN TEST <br /> IMPORTANTII DURING THE TEST, CONTINUOUSLY OBSERVE WATER LEVELS IN THE HOLDING <br /> TANK TRUCKS HAVE BEEN PRESCHEDULED TO MAKE AT LEAST 2 PICKUPS ON 412 AND ONE <br /> PICKUP(IF NECESSARY)ON 413. IF PRODUCING A LOT OF WATER, CONTACT KRISSY ASAP <br /> SHE WILL CONTACT DILLARD TO EXPEDITE WATER REMOVAL <br /> 1) Check laptop water levels in pumping well and observation wells prior to beginning the step <br /> drawdown test Record DTWs and Time on field data sheets. <br /> ' 2) Begin 3-hour step drawdown test by pumping at 3 apm Pump at 3 gpm for approximately <br /> 30 minutes. Record start time of test. Continuously observe DTW readings In RW-1 to ensure <br /> ' that pumping rate will not draw water below pump <br /> 3) If the 3-gpm pumping rate has not produced drawdown in the well, Increase pumping rate <br /> to 4 gpm and pump for 30 minutes. Record water levels at each pump rate on field data <br /> sheets and time of Pumping rate than es. <br /> 4) If 1-gpm steps are showing no effect on water levels, Increase pump rate by higher pump <br /> ' rate intervals, but be sure to NOT DEWATER THE WELL. Apply selected pumping rates at <br /> 30-minute Intervals. Record water levels and f2umping rate chances, <br /> 11ARCO\49MWork Requests\Aquiter Test WkReq doc <br />