Laserfiche WebLink
it .. <br /> • i � <br /> and 23 8 ppb (MW-1), respectively Tert-butyl alcohol TBA was reported in wells MW-2 (215 ppb) and MW-4 (26,100 ppb) Ethyl tert- - <br /> butyl ether (EtBE) was reported in well MW-4 at a concentration of 2 22 ppb <br /> On February 12-16, 2001, SECOR performed multi-phase extraction (MPE) feasibility testing at the site to evaluate whether MPE <br /> technology is a feasible remedial alternative for mitigating hydrocarbon-impacted soil The results of the feasibility test are as follows <br /> • The MPE test was conducted at maximum vapor extraction flow rates ranging between 32 7 to 99 2 standard cubic feet per <br /> minute (scfm) (MW-4/SVE-1), and at vacuum pressures ranging between 5 5 to 25 inches of water column (MW-4/SVE-1) <br /> • Induced vacuum readings were observed in observation wells up to 89 feet away from the extraction well Based on the <br /> responding induced vacuums, the radii of influence for the test ranged between 46 7 feet and 89 2 feet <br /> Field FID readings of total hydrocarbons in the vapor stream extracted from the test wells consistently exceeded 10,000 parts per <br /> million by volume (ppmv) During the test approximately 544 3 pounds of TPHg, 19 5 pounds of benzene, and 440 pounds of <br /> MtBE were extracted from the soil beneath the site <br /> From July 9 to July 16, 2001, West Hazmat Drilling of Rancho Cordova, California drilled two soil bonngs and five groundwater <br /> monitoring wells at the site Soil borings SB-1 and SB-2 were drilled to 80 feet and 78 feet bgs, respectively Monitoring wells MW-5, <br /> MW-6, MW-7, MW-8, and MW-9 were installed at 40 feet bgs <br /> SPH is present in wells MW-4 and SVE-1 Weekly gauging and bailing was initiated in October 2001 <br /> 3.0 Client Safety Procedures <br /> Follow standard ARCO safety procedures <br /> SECOR International Incorporated 2 Genene HASP <br />