My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002748
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:24:23 AM
Creation date
11/6/2018 3:36:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002748
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r S E C 0 R <br /> . Date July 15, 2003 <br /> Quarter 2Q03 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 4932 Address 16 E Harding Way, Stockton, CA <br /> i <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECORIRusty Benkosky <br /> i <br /> Consultant Project No 77BP 54932 03 0336 <br /> Primary Agency/Regulatory ID No San Joaquin County Public Health Services (SJCPHS) <br /> Assembly Bill 681 Status Property owned by ARCO <br /> I <br /> I <br /> WORK PERFORMED THIS QUARTER (Second Quarter - 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Completed construction and began operation of soil vapor extraction and groundwater extraction <br /> remedial system <br /> WORK PROPOSED FOR NEXT QUARTER (Third Quarter - 2003) <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> 3 Install off-site extraction wells and connect the newly installed wells to the remediation system <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater MW-1 through MW-11, EW-1, EW-2, EW-6, DMW-1 <br /> through DMW-3 and SVE-1 Sampled quarterly <br /> Frequency of Groundwater Quarterly <br /> Is Free Product(FP) Present Onsite No <br /> Current Remediation Techniques SVE/GWE <br /> Approximate Depth to Groundwater 29 06—30 46 ft <br /> Groundwater Flow and Gradient Shallow-Northeast @ 0 005 ft/ft <br /> Deep— Northeast @ 0 007 fUft <br /> DISCUSSION. <br /> Total petroleum hydrocarbons as gasoline (TPHg) were reported in four of the eleven wells sampled this <br /> quarter at concentrations ranging from 95 ppb (MW-9) to 51,000 ppb (EW-2) Benzene was reported in one <br /> of the eleven wells at a concentration of 34 ppb (MW-3) Methyl tert-butyl ether(MtBE), analyzed using EPA <br /> Method 8260B,was reported in seven of the eleven wells at concentrations ranging from 0 76 ppb (DMW-2) <br /> {� to 55,000 ppb (EW-2) 1,2-Dichloroethane (1,2-DCA) was reported in five of the wells at concentrations <br /> ranging from 0 72 ppb (MW-9) to 10 ppb (MW-5) Di-isopropyl ether (DIPE) was reported in one well at a <br /> concentration of 1 3 ppb in well DMW-1 Tert-butyl alcohol (TBA), tert-amyl methyl ether (TAME), ethylene <br /> 11ARC0149321Q1V1Rs1200312QMR03 doc -2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.